RunPlan20150624b » History » Version 1

Boyd, Steven, 23 June 2015 11:49

1 1 Boyd, Steven
h1. Shifter Training 24th-25th June 2015
2
3
h2. Schedule 
4
5
Schedule as follows (details for each session are below):
6
7
Schedule is still *to be confirmed*
8
9
h3. Wednesday 24th February
10
11
| *Time* | *Shift A*      | *Shift B*      |
12
| 18:00  | Meet at Hall   |                |
13
| 18:15  | Controlled Access      |             |
14
| 18:45  |                | Meet at Hall        |
15
| 19:00  |                | Controlled Access   |
16
| 19:30  |   Finish       |    Finish           |
17
18
19
h3. Thursday 25th February
20
21
| *Time* | *Shift A*      | *Shift B*      |
22
| 10:00  | ISIS Safety Test | ISIS Safety Test |
23
| 11:00  | CDM + PPE      | CDM + PPE |
24
| 11:30  | MOM Slides     | MOM Slides |
25
| 12:00  | _Lunch_        | _Lunch_           |
26
27
h3. Friday 26th February
28
29
| *Time* |                | 
30
| 14:00  | Meet at Hall   |                
31
| 14:15  | Beamline Training |
32
| 15:15  | Beamline Training      |             |
33
| 16:15  |   Finish       |   
34
35
36
37
| *Name*          | *Confirmed?* | *Has CDM Induction?* | *Has RAL Induction (5 yrs)?* | *Has ISIS Induction (2 yrs)?*  | *Has Boots?* | On shift in June/July  |   Group  |
38
| Mariyan Bogomilov      | Yes| No                    | No                           | No                             | ?            | Yes       | B |
39
| Dan Kaplan             | Yes| No                   | Yes                          | Yes                             | Yes          | Yes       | A |
40
| Ao Liu                 | Yes| No                   | No                           | Yes                          | No           | Yes       | B |
41
| Daniel Bowring         | Yes| No                   | No                           | No                             | Yes          | Yes       | B |
42
43
h1. Trainers
44
45
* Let me know if you have a problem making yourself available on these two days
46
* Please make sure you are available for the whole day where you are scheduled - to allow for schedule slip etc. 
47
* Please ensure that the system for training on is *fully operational*.
48
* If you think that I haven't allowed enough time for training on your system, let me know. I really have no idea how long these things will take. But please stick to time(!)
49
50
| *Name*           | *Subject*     | *Availability* | *Time Req* | *Where*  |
51
| SHE Group        | RAL Induction  |                | 60 mins    | R12 training room |
52
| Rose/MOM         | ISIS Course    |                | 30 mins    | R26  |
53
| John Govans      | CDM + PPE      |                | 30 mins    | Conf Room 9 (R26)    |
54
| John Govans/MOM     | Hall tour      |                | 30 mins    | MICE Hall|
55
| MOM              | MOM Slides     |                | 30 mins    | Conf Room 9 (R26)    |
56
| Craig            | PPS            |                | 120-180 mins | MICE Hall  |
57
| Henry            | Beamline Training  |            | 120 mins    | MICE Hall + MLCR, Needs search |
58
|                  |                |                |            |          |
59
60
# A good way to introduce this material is to have a talky bit covering all aspects and then give everyone a go
61
# Needs search - probably best to complete a search during PPS training and then do the beamline bits following. If you have done the computing/DAQ/online reco etc, then it is very nice to set up for a reference run here
62
63
h1. Training Documentation (from 2013):
64
65
* Syllabus for docs and computing info
66
** Docs: for web start from IIT page; 2 folders in MLCR; check RA/MS (in pocket with ATW)
67
** [[computing-software:ShifterTraining|Computing Shifter Training]]: KVM; Virtual Desktops; Remote Client Launcher, using eLog (inc. reply and search features); using micewww (inc. getting account); Run Summary Spreadsheet :(
68
** (Looking at it, the above seem to be prerequisites for the rest. Suspect that in future sessions it would be best to have those with the Hall tour and MOM talk as a "theoretical" session on the Monday p.m. and then the hands-on on the next day or two.) 
69
** [[computing-software:DAQ and online reconstruction training]]
70
71
h1. MOM
72
73
* Book the hall
74
* Arrange trainers *1 month in advance*
75
* Arrange trainees
76
* Set up schedule
77
* Check RAL/ISIS induction is okay
78
* Book meeting rooms
79
* Update training documentation for bits which MOM is doing
80
* Print training scripts and any other hand outs