June 21st, 2015 (Evening Run)¶
Aim: TOF Calibration
Daily schedule¶
June | 21st | |
Time | 10pm - 6am | |
MOM | V. Blackmore | |
Lead shifter | C. Heidt | |
Shifter 2 | P. Francini | |
BLOC | P. Hanlet | |
SOC | C. Heidt | |
Experimenter | ||
Physics Shifter | C. Rogers | |
Beam? | Yes | |
Additional Personnel | V. Palladino |
Shift Monitoring¶
Shifters should keep a careful eye on:- Water chiller temperature outside the control room (bottom of the red LEDs). If this reaches 25C, immediately power down the magnets and inform the MOM.
- Magnet water temperatures.
- Log any abnormal changes in the eLog
- If yellow temperature alarm sounds, immediately power down the magnets and inform the MOM.
- Magnet water flows.
- Log any abnormal changes in the eLog
- If yellow alarm sounds, immediately power down the magnets and inform the MOM.
- EMR stopping the DAQ arming
- Power cycle the VME crate by following the instructions here
Shift plan:¶
- 8:45pm
- Shifters + BLOC arrive
- Hall and beam line to be closed and prepared for beam
- 10pm
- Start TOF calibration run
- Work on Online Reconstruction, aim to determine coverage of up- and downstream trackers by beam
- Check that POMPOMs ready magnet polarity correctly for input to CDB
- Photograph DAQ summary at end of run for comparison to CDB
- Write more verbose eLogs, describe the problem, its symptoms and solution (if known).
Data Requested¶
- TOF calibration until end of shift -- settings in Run Control
Beamline Configuration¶
- We expect to run with 2V beamloss and the beam bump active.
- DS is off
- Beam settings via Run Control
TOF Calibration run¶
These settings are now in Run Control.
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) |
# | V | mm | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # |
25000 min | 1 | Positron | 300.0 | 259.7 | 249.58 | 29 | 56.35 | 102.7 | 62.65 | 195.72 | --- | 98.59 | 163.16 | 218.79 | 114.14 | 83.40 | 125.70 | 80.06 | 1678 |
Phone details for 6pm daily meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Blackmore, Victoria over 8 years ago ยท 1 revisions