h1. June 20th, 2015 (Evening Run)
2
3
*Aim:* Tracker alignment data
4
5
h3. Daily schedule
6
7
| June  | 20th |   
8
|Time |  10pm - 6am |
9
| MOM       | V. Blackmore   |  
10
| Lead shifter | C. Heidt | 
11
| Shifter 2 |  P. Francini  | 
12
| BLOC      | P. Hanlet   | 
13
| SOC       | C. Heidt   | 
14
| Experimenter | E. Overton, M. Uchida  | 
15
| Physics Shifter | C. Rogers  |
16
|  | | | 
17
| Beam?  | Yes  | 
18
| Additional Personnel | | |  
19
20
21
h2. Shift Monitoring
22
23
Shifters should keep a *careful eye on*:
24
* *Water chiller temperature* outside the control room (bottom of the red LEDs).  If this reaches 25C, immediately power down the magnets and inform the MOM.
25
* *Magnet water temperatures.*
26
** Log any abnormal changes in the eLog
27
** If yellow temperature alarm sounds, immediately power down the magnets and inform the MOM.
28
* *Magnet water flows.*
29
** Log any abnormal changes in the eLog
30
** If yellow alarm sounds, immediately power down the magnets and inform the MOM.
31
* *EMR stopping the DAQ arming*
32
** Power cycle the VME crate by following the instructions "here":http://micewww.pp.rl.ac.uk/projects/operations/wiki/EMR_Detector
33
34
h2. Shift plan:
35
36
* 8:45pm
37
** Shifters + BLOC arrive
38
** Hall and beam line to be closed and prepared for beam
39
* 10pm
40 2 Blackmore, Victoria
** Try 500 spills of a (10, 240) muon beam -- settings in Run Control, *make sure no diffuser is in the beam*
41
** Monitor magnet and chiller temperatures, ramp down on *ANY YELLOW ALARM* or if chiller approaches 25C
42
** If (and only if) temperatures are OK, continue for 100k triggers at TOF2
43
** Else: take 100k triggers at TOF2 of the (3, 200) muon beam as done last night.
44
** Then: TOF calibration for remainder of shift.
45 1 Blackmore, Victoria
46
h2. Data Requested
47
48 2 Blackmore, Victoria
* (10, 240) or (3, 200) muon beam depending on magnet temperature study -- settings in Run Control, *no diffuser*
49 1 Blackmore, Victoria
** Trigger from TOF1
50
** 100k triggers at *TOF2*
51
* TOF calibration until end of shift  -- settings in Run Control
52
53
54
55
h2. Beamline Configuration
56
57
* We expect to run with 2V beamloss and the beam bump active.
58
* DS is off
59
* Beam settings via Run Control
60
61
h3. TOF Calibration run
62
63
These settings are now in Run Control.
64
65
| Number of pulses| Beamloss |  Particle Species| p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
66
| #  | V  | mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|
67
| 25000 min | 1 | Positron | 300.0 | 259.7 | 249.58 | 29  | 56.35 | 102.7 | 62.65 | 195.72| ---| 98.59| 163.16 |218.79 | 114.14| 83.40| 125.70 | 80.06| 1678 |
68
69
70
h2. Phone details for 6pm daily meeting
71
72
Phone access :  ReadyTalk number 
73
74
US 866-740-1260
75
76
UK 0800-496-0576
77
78
Swiss 0800-70-53-51
79
80
Italy 800182592
81
82
Access Code: 2155402