Project

General

Profile

Actions

June 20th, 2015 (Evening Run)

Aim: Tracker alignment data

Daily schedule

June 20th
Time 10pm - 6am
MOM V. Blackmore
Lead shifter C. Heidt
Shifter 2 P. Francini
BLOC P. Hanlet
SOC C. Heidt
Experimenter E. Overton, M. Uchida
Physics Shifter C. Rogers
Beam? Yes
Additional Personnel

Shift Monitoring

Shifters should keep a careful eye on:
  • Water chiller temperature outside the control room (bottom of the red LEDs). If this reaches 25C, immediately power down the magnets and inform the MOM.
  • Magnet water temperatures.
    • Log any abnormal changes in the eLog
    • If yellow temperature alarm sounds, immediately power down the magnets and inform the MOM.
  • Magnet water flows.
    • Log any abnormal changes in the eLog
    • If yellow alarm sounds, immediately power down the magnets and inform the MOM.
  • EMR stopping the DAQ arming
    • Power cycle the VME crate by following the instructions here

Shift plan:

  • 8:45pm
    • Shifters + BLOC arrive
    • Hall and beam line to be closed and prepared for beam
  • 10pm
    • Try 500 spills of a (10, 240) muon beam -- settings in Run Control, make sure no diffuser is in the beam
    • Monitor magnet and chiller temperatures, ramp down on ANY YELLOW ALARM or if chiller approaches 25C
    • If (and only if) temperatures are OK, continue for 100k triggers at TOF2
    • Else: take 100k triggers at TOF2 of the (3, 200) muon beam as done last night.
    • Then: TOF calibration for remainder of shift.

Data Requested

  • (10, 240) or (3, 200) muon beam depending on magnet temperature study -- settings in Run Control, no diffuser
    • Trigger from TOF1
    • 100k triggers at TOF2
  • TOF calibration until end of shift -- settings in Run Control

Beamline Configuration

  • We expect to run with 2V beamloss and the beam bump active.
  • DS is off
  • Beam settings via Run Control

TOF Calibration run

These settings are now in Run Control.

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s)
# V mm A A A A A A A A A A A A A A A A DAQ run #
25000 min 1 Positron 300.0 259.7 249.58 29 56.35 102.7 62.65 195.72 --- 98.59 163.16 218.79 114.14 83.40 125.70 80.06 1678

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Blackmore, Victoria over 8 years ago ยท 2 revisions