RunPlan20150619 » History » Version 3
Drielsma, François, 19 June 2015 16:57
1 | 1 | Blackmore, Victoria | h1. June 19th, 2015 (Evening Run) |
---|---|---|---|
2 | |||
3 | *Aim:* Tracker alignment data |
||
4 | |||
5 | h3. Daily schedule |
||
6 | |||
7 | | June | 19th | |
||
8 | |Time | 10pm - 6am | |
||
9 | | MOM | V. Blackmore | |
||
10 | | Lead shifter | C. Heidt | |
||
11 | | Shifter 2 | P. Francini | |
||
12 | | BLOC | P. Hanlet | |
||
13 | | SOC | C. Heidt | |
||
14 | | Experimenter | E. Overton, M. Uchida | |
||
15 | | Physics Shifter | C. Rogers | |
||
16 | | | | | |
||
17 | | Beam? | Yes | |
||
18 | | Additional Personnel | | | |
||
19 | |||
20 | |||
21 | h2. Shift Monitoring |
||
22 | |||
23 | Shifters should keep a *careful eye on*: |
||
24 | * *Water chiller temperature* outside the control room (bottom of the red LEDs). If this reaches 25C, immediately power down the magnets and inform the MOM. |
||
25 | * *Magnet water temperatures.* |
||
26 | ** Log any abnormal changes in the eLog |
||
27 | ** If yellow temperature alarm sounds, immediately power down the magnets and inform the MOM. |
||
28 | * *Magnet water flows.* |
||
29 | ** Log any abnormal changes in the eLog |
||
30 | ** If yellow alarm sounds, immediately power down the magnets and inform the MOM. |
||
31 | 2 | Blackmore, Victoria | * *EMR stopping the DAQ arming* |
32 | 3 | Drielsma, François | ** Power cycle the VME crate by following the instructions "here":http://micewww.pp.rl.ac.uk/projects/operations/wiki/EMR_Detector |
33 | 1 | Blackmore, Victoria | |
34 | h2. Shift plan: |
||
35 | |||
36 | * 8:45pm |
||
37 | ** Shifters + BLOC arrive |
||
38 | ** Hall and beam line to be closed and prepared for beam |
||
39 | * 10pm |
||
40 | ** Check magnet chilled water temperatures in archiver |
||
41 | ** Take 500 spills of Configuration 1 and calculate ratio of TOF1 to TOF2 triggers (i.e. attempt to quantify transmission) |
||
42 | ** Take 500 spills of Configuration 2 and calculate ratio of TOF1 to TOF2 triggers (i.e. attempt to quantify transmission) |
||
43 | ** Continue data taking of beam setting with largest transmission, minimum 50k accepted triggers at *TOF2* |
||
44 | ** If transmission of beams is similar and 50k triggers at TOF2 is easily achieved within shift, take 50k triggers at TOF2 of the alternative configuration. Otherwise, prefer higher momentum (configuration 1) |
||
45 | |||
46 | h2. Data Requested |
||
47 | |||
48 | * (3, 300) muon beam |
||
49 | * Trigger from TOF1 |
||
50 | * 50k triggers at *TOF2* |
||
51 | |||
52 | |||
53 | |||
54 | h2. Beamline Configurations |
||
55 | |||
56 | * We expect to run with 2V beamloss and the beam bump active. |
||
57 | * DS is off |
||
58 | * Beam settings via Run Control |
||
59 | |||
60 | h3. Configuration 1 |
||
61 | |||
62 | Setting for 300 MeV/c however upstream is set to the max available current (a bit lower than typically coming from Marco's table): |
||
63 | |||
64 | | Number of pulses| Beamloss | Particle Species| p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|RunControl tag| |
||
65 | | # | V | | MeV/c| MeV/c| MeV/c| mm| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|| |
||
66 | | | | Pi+/Mu+ | 512 | 508.75 | 333 | 82 | 109.21 | 199.75 | 122.30 | 437.83| -| 124.71| 221.83 |297.48 | 197.36| 202.43| 306.46 | 261.93| |300+No_DS| |
||
67 | |||
68 | h3. Configuration 2 |
||
69 | |||
70 | Setting for 270 MeV/however upstream is set to the max available current, which than corresponds to about 270 MeV/c into the Cooling Channel: |
||
71 | |||
72 | | Number of pulses| Beamloss | Particle Species| p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|RunControl tag| |
||
73 | | # | V | | MeV/c| MeV/c| MeV/c| mm| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|| |
||
74 | | | | Pi+/Mu+ | 512 | 508.75 | 299.26 | 82 | 109.21 | 199.75 | 122.30 | 437.83| -| 112.49| 199.23 |267.19 | 177.23| 180.04| 272.52 | 232.88| |270+No_DS| |
||
75 | |||
76 | |||
77 | h2. Phone details for 6pm daily meeting |
||
78 | |||
79 | Phone access : ReadyTalk number |
||
80 | |||
81 | US 866-740-1260 |
||
82 | |||
83 | UK 0800-496-0576 |
||
84 | |||
85 | Swiss 0800-70-53-51 |
||
86 | |||
87 | Italy 800182592 |
||
88 | |||