RunPlan20150619 » History » Revision 2

« Previous | Revision 2/4 (diff) | Next »
Blackmore, Victoria, 19 June 2015 16:54


June 19th, 2015 (Evening Run)

Aim: Tracker alignment data

Daily schedule

June 19th
Time 10pm - 6am
MOM V. Blackmore
Lead shifter C. Heidt
Shifter 2 P. Francini
BLOC P. Hanlet
SOC C. Heidt
Experimenter E. Overton, M. Uchida
Physics Shifter C. Rogers
Beam? Yes
Additional Personnel

Shift Monitoring

Shifters should keep a careful eye on:
  • Water chiller temperature outside the control room (bottom of the red LEDs). If this reaches 25C, immediately power down the magnets and inform the MOM.
  • Magnet water temperatures.
    • Log any abnormal changes in the eLog
    • If yellow temperature alarm sounds, immediately power down the magnets and inform the MOM.
  • Magnet water flows.
    • Log any abnormal changes in the eLog
    • If yellow alarm sounds, immediately power down the magnets and inform the MOM.
  • EMR stopping the DAQ arming
    • See instructions here

Shift plan:

  • 8:45pm
    • Shifters + BLOC arrive
    • Hall and beam line to be closed and prepared for beam
  • 10pm
    • Check magnet chilled water temperatures in archiver
    • Take 500 spills of Configuration 1 and calculate ratio of TOF1 to TOF2 triggers (i.e. attempt to quantify transmission)
    • Take 500 spills of Configuration 2 and calculate ratio of TOF1 to TOF2 triggers (i.e. attempt to quantify transmission)
    • Continue data taking of beam setting with largest transmission, minimum 50k accepted triggers at TOF2
    • If transmission of beams is similar and 50k triggers at TOF2 is easily achieved within shift, take 50k triggers at TOF2 of the alternative configuration. Otherwise, prefer higher momentum (configuration 1)

Data Requested

  • (3, 300) muon beam
  • Trigger from TOF1
  • 50k triggers at TOF2

Beamline Configurations

  • We expect to run with 2V beamloss and the beam bump active.
  • DS is off
  • Beam settings via Run Control

Configuration 1

Setting for 300 MeV/c however upstream is set to the max available current (a bit lower than typically coming from Marco's table):

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) RunControl tag
# V MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
Pi+/Mu+ 512 508.75 333 82 109.21 199.75 122.30 437.83 - 124.71 221.83 297.48 197.36 202.43 306.46 261.93 300+No_DS

Configuration 2

Setting for 270 MeV/however upstream is set to the max available current, which than corresponds to about 270 MeV/c into the Cooling Channel:

Number of pulses Beamloss Particle Species p at Tgt p@D1 p@D2 Proton Absorber Q1 Q2 Q3 D1 DS D2 Q4 Q5 Q6 Q7 Q8 Q9 Similar Run(s) RunControl tag
# V MeV/c MeV/c MeV/c mm A A A A A A A A A A A A DAQ run #
Pi+/Mu+ 512 508.75 299.26 82 109.21 199.75 122.30 437.83 - 112.49 199.23 267.19 177.23 180.04 272.52 232.88 270+No_DS

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Blackmore, Victoria over 8 years ago · 2 revisions