Actions
June 18th, 2015 (Evening Run)¶
Aim: Downstream tracker debugging, if all OK beam through to downstream tracker
Daily schedule¶
June | 18th | |
Time | 10pm - 6am | |
MOM | V. Blackmore | |
Lead shifter | C. Heidt | |
Shifter 2 | P. Francini | |
BLOC | P. Hanlet | |
SOC | C. Heidt | |
Experimenter | E. Overton, M. Uchida | |
Physics Shifter | C. Rogers | |
Beam? | Yes | |
Additional Personnel |
Shift plan:¶
- 8:45pm
- Shifters + BLOC arrive
- Hall and beam line to be closed and prepared for beam
- 10pm
- Experimenters begin
- Debug downstream tracker using pion reference beam and TOF1 trigger
- If downstream tracker deemed ready for data by experts:
- If DS on: run (6, 200) muon beam through to EMR for remainder of shift
- If DS off: TOF calibration
Data Requested¶
- (6, 200) muon beam or TOF calibration
Beamline Configurations¶
- We expect to run with 2V beamloss and the beam bump active.
- DS status in flux
- Beam settings via Run Control -- NB: "Calibration" button in Run Control does not (yet) set a TOF calibration beam.
Initial Scans from Sundays Timing:¶
Note: Downstream tracker has timing interpolated from upstream. Its a Guess.
Number of pulses | Beamloss | Particle Species | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) | Run | Comments |
# | V | mm | A | A | A | A | A | A | A | A | A | A | A | A | A | # | # | |
300 | 1 | 6-200 u | 117 | 102.4 | 127.9 | 89 | 323.2 | >< | 94.2 | 158.1 | 212.0 | 140.6 | 138.7 | 209.8 | 179.2 | last sunday | 6951 | Without Alive Veto |
300 | 1 | 6-200 u | 117 | 102.4 | 127.9 | 89 | 323.2 | >< | 94.2 | 158.1 | 212.0 | 140.6 | 138.7 | 209.8 | 179.2 | last sunday | 6952 | Including Alive Veto |
Tracker timing studies¶
- Beam settings as dictated by E. Overton & M. Uchida
- Reference pion beam (number of triggers not yet specified)
(6, 200) mu+ beam with DS¶
Note change of proton absorber
Number of pulses | Beamloss | Particle Species | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) | Run | Comments | |
# | V | mm | A | A | A | A | A | A | A | A | A | A | A | A | # | # | |||
Remainder of shift | 1 | (6-200) muon | 83 | 102.4 | 127.9 | 89 | 323.2 | 668.6 | 94.2 | 158.1 | 212.0 | 140.6 | 138.7 | 209.8 | 179.2 | today | 6952 | Including Alive Veto |
TOF Calibration run¶
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) |
# | V | mm | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # |
25000 min | 1 | Positron | 300.0 | 259.7 | 249.58 | 29 | 56.35 | 102.7 | 62.65 | 195.72 | --- | 98.59 | 163.16 | 218.79 | 114.14 | 83.40 | 125.70 | 80.06 | 1678 |
Phone details for 6pm daily meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402