RunPlan20150611 » History » Version 6
Blackmore, Victoria, 11 June 2015 18:58
1 | 1 | Blackmore, Victoria | h1. June 11th, 2015 (Evening Run) |
---|---|---|---|
2 | |||
3 | *Aim:* Calibrating TOFs, testing Run Control, testing Online Reconstruction |
||
4 | |||
5 | |||
6 | h3. Daily schedule |
||
7 | |||
8 | | June | 11th | |
||
9 | |Time | 9pm - 5am | |
||
10 | | MOM | V. Blackmore | |
||
11 | | Lead shifter | S. Middleton | |
||
12 | | Shifter 2 | J. Nugent | |
||
13 | | BLOC | A. Dobbs | |
||
14 | | SOC | A. Dobbs | |
||
15 | | Experimenter | A. Dobbs, P. Hanlet | |
||
16 | | Physics Shifter | P. Franchini | |
||
17 | | | | | |
||
18 | | Beam? | Yes | |
||
19 | | Additional Personnel | | | |
||
20 | |||
21 | |||
22 | h2. Shift plan: |
||
23 | |||
24 | * 7:30pm |
||
25 | ** Shifters + BLOC arrive |
||
26 | ** Hall and beam line to be closed and prepared for beam |
||
27 | * 9pm |
||
28 | 2 | Blackmore, Victoria | ** E. Overton to remove tracker veto from DAQ before TOF calibration begins |
29 | 1 | Blackmore, Victoria | ** Check TOF1 response channel-by-channel |
30 | 2 | Blackmore, Victoria | ** Operate experiment via Run Control, take data through to TOF2/KL/EMR to calibrate TOFs and test Online Reconstruction |
31 | 1 | Blackmore, Victoria | ** Settings as A. Dobbs requires |
32 | |||
33 | |||
34 | h2. Data Requested |
||
35 | |||
36 | 5 | Blackmore, Victoria | * TOF calibration |
37 | 1 | Blackmore, Victoria | |
38 | |||
39 | 5 | Blackmore, Victoria | |
40 | 1 | Blackmore, Victoria | h2. Beamline Configurations |
41 | |||
42 | * We expect to run with 2V beamloss and the beam bump active. |
||
43 | * DS is currently off |
||
44 | * Beam settings via Run Control |
||
45 | 5 | Blackmore, Victoria | ** TOF calibration, short runs for Run Control testing |
46 | 6 | Blackmore, Victoria | ** TOF calibration, long 100k triggers run -- aim for 1000 triggers/pixel (~25'000 spills, or until the end of the shift) |
47 | 5 | Blackmore, Victoria | |
48 | 1 | Blackmore, Victoria | |
49 | 4 | Blackmore, Victoria | h3. TOF Calibration run |
50 | |||
51 | | Number of pulses| Beamloss | Particle Species| p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)| |
||
52 | | # | V | mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #| |
||
53 | | 25000 min | 1 | Positron | 300.0 | 259.7 | 249.58 | 29 | 56.35 | 102.7 | 62.65 | 195.72| ---| 98.59| 163.16 |218.79 | 114.14| 83.40| 125.70 | 80.06| 1678 | |
||
54 | |||
55 | |||
56 | 1 | Blackmore, Victoria | |
57 | h2. Phone details for 6pm daily meeting |
||
58 | |||
59 | Phone access : ReadyTalk number |
||
60 | |||
61 | US 866-740-1260 |
||
62 | |||
63 | UK 0800-496-0576 |
||
64 | |||
65 | Swiss 0800-70-53-51 |
||
66 | |||
67 | Italy 800182592 |
||
68 | |||
69 | Access Code: 2155402 |