RunPlan20150611 » History » Revision 3
Revision 2 (Blackmore, Victoria, 11 June 2015 18:35) → Revision 3/6 (Blackmore, Victoria, 11 June 2015 18:37)
h1. June 11th, 2015 (Evening Run) *Aim:* Calibrating TOFs, testing Run Control, testing Online Reconstruction h3. Daily schedule | June | 11th | |Time | 9pm - 5am | | MOM | V. Blackmore | | Lead shifter | S. Middleton | | Shifter 2 | J. Nugent | | BLOC | A. Dobbs | | SOC | A. Dobbs | | Experimenter | A. Dobbs, P. Hanlet | | Physics Shifter | P. Franchini | | | | | | Beam? | Yes | | Additional Personnel | | | h2. Shift plan: * 7:30pm ** Shifters + BLOC arrive ** Hall and beam line to be closed and prepared for beam * 9pm ** E. Overton to remove tracker veto from DAQ before TOF calibration begins ** Check TOF1 response channel-by-channel ** Operate experiment via Run Control, take data through to TOF2/KL/EMR to calibrate TOFs and test Online Reconstruction ** Settings as A. Dobbs requires h2. Data Requested * TOF1 calibration * TOF0 and TOF2 calibration time permitting No data requested h2. Beamline Configurations * We expect to run with 2V beamloss and the beam bump active. * DS is currently off * Beam settings via Run Control ** TOF1 calibration, short runs for Run Control testing ** TOF1 calibration, long 100k triggers run -- aim for 1000 triggers/pixel ** TOF0, TOF2 calibration, long 100k triggers runs (time permitting) h2. Phone details for 6pm daily meeting Phone access : ReadyTalk number US 866-740-1260 UK 0800-496-0576 Swiss 0800-70-53-51 Italy 800182592 Access Code: 2155402