Project

General

Profile

Actions

RunPlan20150611 » History » Revision 2

« Previous | Revision 2/6 (diff) | Next »
Blackmore, Victoria, 11 June 2015 18:35


June 11th, 2015 (Evening Run)

Aim: Calibrating TOFs, testing Run Control, testing Online Reconstruction

Daily schedule

June 11th
Time 9pm - 5am
MOM V. Blackmore
Lead shifter S. Middleton
Shifter 2 J. Nugent
BLOC A. Dobbs
SOC A. Dobbs
Experimenter A. Dobbs, P. Hanlet
Physics Shifter P. Franchini
Beam? Yes
Additional Personnel

Shift plan:

  • 7:30pm
    • Shifters + BLOC arrive
    • Hall and beam line to be closed and prepared for beam
  • 9pm
    • E. Overton to remove tracker veto from DAQ before TOF calibration begins
    • Check TOF1 response channel-by-channel
    • Operate experiment via Run Control, take data through to TOF2/KL/EMR to calibrate TOFs and test Online Reconstruction
    • Settings as A. Dobbs requires

Data Requested

  • No data requested

Beamline Configurations

  • We expect to run with 2V beamloss and the beam bump active.
  • DS is currently off
  • Beam settings via Run Control
    • TOF1 calibration, short runs for Run Control testing
    • TOF1 calibration, long 100k triggers run -- aim for 1000 triggers/pixel
    • TOF0, TOF2 calibration, long 100k triggers runs (time permitting)

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Blackmore, Victoria over 8 years ago · 2 revisions