Actions
RunPlan20150611 » History » Revision 2
« Previous |
Revision 2/6
(diff)
| Next »
Blackmore, Victoria, 11 June 2015 18:35
June 11th, 2015 (Evening Run)¶
Aim: Calibrating TOFs, testing Run Control, testing Online Reconstruction
Daily schedule¶
June | 11th | |
Time | 9pm - 5am | |
MOM | V. Blackmore | |
Lead shifter | S. Middleton | |
Shifter 2 | J. Nugent | |
BLOC | A. Dobbs | |
SOC | A. Dobbs | |
Experimenter | A. Dobbs, P. Hanlet | |
Physics Shifter | P. Franchini | |
Beam? | Yes | |
Additional Personnel |
Shift plan:¶
- 7:30pm
- Shifters + BLOC arrive
- Hall and beam line to be closed and prepared for beam
- 9pm
- E. Overton to remove tracker veto from DAQ before TOF calibration begins
- Check TOF1 response channel-by-channel
- Operate experiment via Run Control, take data through to TOF2/KL/EMR to calibrate TOFs and test Online Reconstruction
- Settings as A. Dobbs requires
Data Requested¶
- No data requested
Beamline Configurations¶
- We expect to run with 2V beamloss and the beam bump active.
- DS is currently off
- Beam settings via Run Control
- TOF1 calibration, short runs for Run Control testing
- TOF1 calibration, long 100k triggers run -- aim for 1000 triggers/pixel
- TOF0, TOF2 calibration, long 100k triggers runs (time permitting)
Phone details for 6pm daily meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Blackmore, Victoria over 8 years ago · 2 revisions