h1. June 11th, 2015 (Evening Run)
2
3
*Aim:* Calibrating TOFs, testing Run Control, testing Online Reconstruction
4
5
6
h3. Daily schedule
7
8
| June  | 11th |   
9
|Time |  9pm - 5am |
10
| MOM       | V. Blackmore   |  
11
| Lead shifter | S. Middleton | 
12
| Shifter 2 |  J. Nugent  | 
13
| BLOC      | A. Dobbs   | 
14
| SOC       | A. Dobbs   | 
15
| Experimenter | A. Dobbs, P. Hanlet  | 
16
| Physics Shifter | P. Franchini |
17
|  | | | 
18
| Beam?  | Yes  | 
19
| Additional Personnel | | |  
20
21
22
h2. Shift plan:
23
24
* 7:30pm
25
** Shifters + BLOC arrive
26
** Hall and beam line to be closed and prepared for beam
27
* 9pm
28
** Check TOF1 response channel-by-channel 
29
** Operate experiment via Run Control, take data through to TOF2/KL/EMR to test Online Reconstruction
30
** Settings as A. Dobbs requires
31
32
33
h2. Data Requested
34
35
* No data requested
36
37
38
h2. Beamline Configurations
39
40
* We expect to run with 2V beamloss and the beam bump active.
41
* DS is currently off
42
* Beam settings via Run Control
43
** TOF1 calibration, short runs for Run Control testing
44
** TOF1 calibration, long 100k triggers run -- aim for 1000 triggers/pixel
45
** TOF0, TOF2 calibration, long 100k triggers runs (time permitting)
46
47
48
h2. Phone details for 6pm daily meeting
49
50
Phone access :  ReadyTalk number 
51
52
US 866-740-1260
53
54
UK 0800-496-0576
55