Project

General

Profile

Actions

June 10th, 2015 (Evening Run)

Aim: Testing Online Reconstruction

Daily schedule

June 7th
Time 8pm - 4am
MOM V. Blackmore
Lead shifter J. Nugent
Shifter 2 S. Middleton
BLOC A. Dobbs
SOC A. Dobbs
Experimenter A. Dobbs
Physics Shifter P. Franchini
Beam? Yes
Additional Personnel

Shift plan:

  • 6:30pm
    • Shifters + BLOC arrive
    • Hall and beam line to be closed and prepared for beam
  • 8pm
    • Operate experiment via Run Control, take data through to TOF2/KL/EMR to test Online Reconstruction
    • Settings as A. Dobbs requires

Data Requested

  • No data requested

Beamline Configurations

  • We expect to run with 2V beamloss and the beam bump active.
  • TOF1 is not in the beam line
  • DS is currently off
  • Beam settings via Run Control and A. Dobbs. Begin with a reference run.

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Blackmore, Victoria over 8 years ago ยท 1 revisions