Actions
June 10th, 2015 (Evening Run)¶
Aim: Testing Online Reconstruction
Daily schedule¶
June | 7th | |
Time | 8pm - 4am | |
MOM | V. Blackmore | |
Lead shifter | J. Nugent | |
Shifter 2 | S. Middleton | |
BLOC | A. Dobbs | |
SOC | A. Dobbs | |
Experimenter | A. Dobbs | |
Physics Shifter | P. Franchini | |
Beam? | Yes | |
Additional Personnel |
Shift plan:¶
- 6:30pm
- Shifters + BLOC arrive
- Hall and beam line to be closed and prepared for beam
- 8pm
- Operate experiment via Run Control, take data through to TOF2/KL/EMR to test Online Reconstruction
- Settings as A. Dobbs requires
Data Requested¶
- No data requested
Beamline Configurations¶
- We expect to run with 2V beamloss and the beam bump active.
- TOF1 is not in the beam line
- DS is currently off
- Beam settings via Run Control and A. Dobbs. Begin with a reference run.
Phone details for 6pm daily meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Blackmore, Victoria over 8 years ago ยท 1 revisions