Actions
June 9th, 2015 (Evening Run)¶
Aim: Testing Run Control
Daily schedule¶
June | 7th | |
Time | 9pm - 5am | |
MOM | V. Blackmore | |
Lead shifter | A. Dobbs | |
Shifter 2 | S. Middleton | |
BLOC | A. Dobbs | |
SOC | A. Dobbs | |
Experimenter | P. Hanlet | |
Physics Shifter | P. Franchini | |
Beam? | Yes | |
Additional Personnel |
Shift plan:¶
- 7pm
- Shifters arrive
- Hall and beam line to be closed and prepared for beam
- 9pm
- Experimenter arrives
- Operate experiment via Run Control, starting/stopping as P. Hanlet sees fit.
- Settings as P. Hanlet requires
Data Requested¶
- No data requested
Beamline Configurations¶
- We expect to run with 2V beamloss and the beam bump active.
- TOF1 is not in the beam line
- DS is currently off
- Beam settings via Run Control and P. Hanlet. No specific beam required for tests.
Phone details for 6pm daily meeting¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Blackmore, Victoria over 8 years ago ยท 1 revisions