Project

General

Profile

Actions

June 9th, 2015 (Evening Run)

Aim: Testing Run Control

Daily schedule

June 7th
Time 9pm - 5am
MOM V. Blackmore
Lead shifter A. Dobbs
Shifter 2 S. Middleton
BLOC A. Dobbs
SOC A. Dobbs
Experimenter P. Hanlet
Physics Shifter P. Franchini
Beam? Yes
Additional Personnel

Shift plan:

  • 7pm
    • Shifters arrive
    • Hall and beam line to be closed and prepared for beam
  • 9pm
    • Experimenter arrives
    • Operate experiment via Run Control, starting/stopping as P. Hanlet sees fit.
    • Settings as P. Hanlet requires

Data Requested

  • No data requested

Beamline Configurations

  • We expect to run with 2V beamloss and the beam bump active.
  • TOF1 is not in the beam line
  • DS is currently off
  • Beam settings via Run Control and P. Hanlet. No specific beam required for tests.

Phone details for 6pm daily meeting

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Blackmore, Victoria over 8 years ago ยท 1 revisions