Actions
June 7th, 2015 (Evening Run)¶
Aim: Prepare the upstream tracker for taking data, timing it with TOF0.
Daily schedule¶
June | 7th | |
Time | 10pm - 6am | |
MOM | V. Blackmore | |
Lead shifter | A. Dobbs | |
Shifter 2 | S. Middleton | |
BLOC | A. Dobbs | |
SOC | A. Dobbs | |
Experimenter | E. Overton, M. Uchida | |
Physics Shifter | P. Franchini | |
Beam? | Yes | |
Additional Personnel |
Shift plan:¶
- 10pm
- Shifters arrive
- Hall and beam line still prepared from previous run
- Experts still present
- Run the best pion beam and timing configuration determined by Ed & Melissa in previous shift
- Monitor online reconstruction, fix if possible
- Given time and rate at TOF2, repeat run (identical beam line settings) with thinnest diffuser iris (iris 1).
- Given time and rate at TOF2, repeat with diffuser iris 2 (each run adding more radiation lengths -- pay particular attention to rate at TOF2, as more diffuser will decrease this significantly)
Data Requested¶
- Data to uptream tracker
Beamline Configurations¶
- We expect to run with 2V beamloss and the beam bump active.
- TOF1 is not in the beam line
- DS is currently off
- Begin with a pion beam from Run Control (e.g. as used for a TOF calibration) and adjust as instructed by E. Overton and M. Uchida
Phone details¶
Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402
Updated by Blackmore, Victoria over 8 years ago ยท 1 revisions