Aim: Prepare the upstream tracker for taking data, timing it with TOF0.

Daily schedule

June 7th
Time 4pm - 10pm
MOM V. Blackmore
Lead shifter J. Nugent
Shifter 2
BLOC A. Dobbs
SOC A. Dobbs
Experimenter E. Overton, M. Uchida
Physics Shifter P. Franchini
Beam? Yes
Additional Personnel

Shift plan:

  • 2:30pm
    • Shifters and BLOC arrive
    • Close and secure Hall
    • Prepare DAQ and Run Control for running
    • Prepare Muon Beam Line for running
  • 4pm
    • Experts arrive.
    • Run a pion beam of Ed & Melissa's choice (via Run Control) and figure out timing between ISIS, TOF0 and tracker
  • 6pm
    • Daily meeting:0800-496-0576, Access Code: 2155402
    • Discuss timing progress and usefulness of evening run (without DS and given observed rates thus far)
  • 10pm

Data Requested

  • Data to figure out tracker timing
  • Data to test Run Control

Beamline Configurations

  • We expect to run with 2V beamloss and the beam bump active.
  • TOF1 is not in the beam line
  • DS is currently off
  • Begin with a pion beam from Run Control (e.g. as used for a TOF calibration) and adjust as instructed by E. Overton and M. Uchida
  • Run Control testing between tracker data runs

Phone details

Phone access : ReadyTalk number

US 866-740-1260

UK 0800-496-0576

Swiss 0800-70-53-51

Italy 800182592

Access Code: 2155402

Updated by Blackmore, Victoria over 8 years ago ยท 2 revisions