Project

General

Profile

RunPlan20150328 » History » Version 9

Karadzhov, Yordan, 26 March 2015 11:26

1 8 Karadzhov, Yordan
h1. Target commissioning + CKOV HV scan - 28th/29th March 2015
2 1 Boyd, Steven
3
h2. The purpose of the run is to:
4
5
* Get the system to a state where ToF (and CKOV) Calibration data can be taken
6
* Take some TOF calibration data 
7
8
h3. Daily schedule
9
10
| Date           | Saturday   | Saturday          |   Sunday      | Sunday     |  
11
| estimated time | 8am - 4pm    | 4 - 12pm        |  8am - 4pm    |  4pm - 12pm |
12
| MOM            | Y. Karadzhov | Y. Karadzhov    |  Y. Karadzhov | Y. Karadzhov   |
13
| Lead shifter   | P. Franchini | P. Hanlet       |  P. Frachini  | P. Hanlet       |
14 7 Boyd, Steven
| Shifter        | H. Nebrensky | P. Soler        |  H. Nebrensky | P. Soler | 
15 4 Boyd, Steven
| BLOC           |              |                 |               |                | 
16 1 Boyd, Steven
| SOC            |              |                 |               |                |
17
| Expert         |  Y Karadzhov (DAQ)|  | | |
18 2 Boyd, Steven
|                |              |                 |               |                | 
19
| Aim            | Take Data    |                 |               |                |
20
|                |              |                 |               |                |
21 5 Boyd, Steven
| Beam?          | Yes          | Yes             | Yes           | Yes            | 
22 6 Boyd, Steven
| Additional Personnel          |                 |               |                |  |
23 1 Boyd, Steven
24
h2. Prerequisites
25
26
"Run Preparation List":http://micewww.pp.rl.ac.uk/projects/operations/wiki/RunPreparationList
27
28
h2. Data Requested
29
30
h2. Beamline Configurations
31
32
* N.B. Decay Solenoid will not be available.
33
* We expect to be running with 2V beamloss and beam bump active.
34
35
h3. Preparation
36
37
* We will run beam into the hall so need to secure the MICE Hall
38
* Target needs to be ready
39
* BeamLine elements need to be ready
40
* Detectors need to be ready
41
* Controls needs to be ready
42
* DAQ needs to be ready
43
* OnMon and OnRec need to be ready
44
* Data Mover needs to be ready
45
46
h3. Shifter target training
47
48
* at shift handover on Saturday - somewhere between 15:00-17:00
49
50
h2. DAQ testing
51
52
* We will take data with TOF0, TOF1 and Ckov. This means that we will use only one LDC (VME crate).
53 9 Karadzhov, Yordan
* The main goal of this run is the continue with the commissioning of the new trigger system, and to investigate the stability issue found last weekend. 
54
* We will start with the debugging of the the stability issue. This operation will require unspecified amount of time.
55
#  The beam line will be set for Reference Run without Decay Solenoid.
56 1 Boyd, Steven
57
Reference Run without Decay Solenoid
58
59
| Particle Species| p at Tgt | p@D1| p@D2| p@Tof0 |Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
60
|  | MeV/c |MeV/c |MeV/c | MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| DAQ run #|
61
|  pion| 272.42|268.67|265.98| 143.4| 29 | 57.8 | 105.6 | 64.6 | 202.8| ---| 100.4| 176.8 | 237.1| 157.2| 157.6| 238.5 | 203.7| 5729 |
62
63 9 Karadzhov, Yordan
h2. TOF calibration by using the old trigger system.
64 1 Boyd, Steven
65 9 Karadzhov, Yordan
* This calibration will be used for comparison New vs. Old Trigger
66
* The goal will be to take 30 000 target pulse or more.
67
* Trigger provided by the old Tr. system.
68
# The beam line will be set for  TOF Calibration run.
69 1 Boyd, Steven
70
h3. TOF Calibration run
71
72
| Number of pulses| Beamloss |  Particle Species| p at Tgt | p@D1| p@D2| Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
73
| #  | V  | mm | A| A| A| A| A| A| A| A | A | A | A | A|A|A|A|A| DAQ run #|
74
| 30000 | 1 | Positron | 300.0 | 259.7 | 249.58 | 29  | 56.35 | 102.7 | 62.65 | 195.72| ---| 98.59| 163.16 |218.79 | 114.14| 83.40| 125.70 | 80.06| 1678 |
75
76 9 Karadzhov, Yordan
h2. CKOV HV scan run
77
78
* We also want to do a Ckov HV and momentum scan.
79
* To be carried out simultaneously and parasitically with the TOF calibration run on electron beam as shown above
80
* Previous run to be split into 5 runs with 5000 pulses each run, scanning in a range of +- 50 V around nominal settings for CKOV HV settings
81
82
| Run type | Number of pulses| CKOVa1 | CKOVa2 | CKOVa3 | CKOVa4 | CKOVb1| CKOVb2 | CKOVb3 | CKOVb4 |
83
|  | #  | V  | V | V | V | V | V | V | V | 
84
| Default CKOV HV | 5000 | 1610 | 1520  | 1570 | 1625 | 1540 | 1590 | 1540 | 1495|
85
| Default CKOV HV - 50V | 5000 | 1560 | 1470  | 1520 | 1575 | 1490 | 1540 | 1490 | 1445|
86
| Default CKOV HV - 25V |  5000 | 1585 | 1495  | 1545 | 1600 | 1515 | 1565 | 1515 | 1470|
87
| Default CKOV HV + 25V | 5000 | 1635 | 1545  | 1595 | 1650 | 1565 | 1615 | 1565 | 1520|
88
| Default CKOV HV + 50V | 5000 | 1660 | 1570  | 1620 | 1675 | 1590 | 1640 | 1590 | 1545|
89
90
h2. CKOV momentum scan run 
91
92
If there is still time to perform more runs, return the CKOV HV to its default settings. Then we will do a momentum scan on the pion momentum. There should be enough statistics with only 2000 actuations each run.
93
94
| Number of pulses | Particle Species| p at Tgt | p@D1| p@D2|Proton Absorber | Q1 | Q2 | Q3 | D1| DS | D2| Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s)|
95
| #  |  | MeV/c |MeV/c |MeV/c | mm | A| A| A| A| A| A| A| A | A | A | A | A| DAQ run #|
96
| 2000 |  pion| 300 |268.67|265.98| 29 | 57.8 | 105.6 | 64.6 | 202.8| ---| 100.4| 176.8 | 237.1| 157.2| 157.6| 238.5 | 203.7| 5729 |
97
| 2000 |  pion| 325 |321.5|319| 83 | 69.1 |126.3 |77.31 | 246| ---| 119.6| 212.4| 284.8 | 188.9 | 193.7| 293.2 |250.6| 5439 |
98
| 2000 |  pion| 350 |346.58 | 344.14 | 83 | 74.5 | 136.1 | 83.3| 267.7 | ---| 128.8| 229.2 | 307.4 | 204|  210.6 | 318.8 | 272.5 | 5444 |
99
| 2000 |  pion| 375 |371.6 | 369.2 | 83 | 79.8 | 146 | 89.4 | 290.4 | ---| 137.9| 246 | 330 | 218.9|  227.3 | 344.1 | 294.2 | 5442 |
100
| 2000 |  pion| 400 |396.7 | 394.3 | 83 | 85.2 | 155.8 | 95.4 | 314.3 | ---| 147.1| 262.8 | 352.5 | 233.9|  244 | 369.4 | 315.8 | 5440 |
101
| 2000 |  pion| 425 |421.7 | 419.36 | 83 | 90.55 | 165.6 | 101.38 | 339.36 | ---| 156.26| 279.61 | 374.97 | 248.84| 260.49 | 394.43 | 337.23 | 5437 |
102 1 Boyd, Steven
103
h2. Finish
104
105
* Shutdown target and re-open Hall for Monday