Target commissioning + CKOV HV scan - 28th/29th March 2015¶
The purpose of the run is to:¶
- Get the system to a state where ToF (and CKOV) Calibration data can be taken
- Take some TOF calibration data
Daily schedule¶
Date | Saturday | Saturday | Sunday | Sunday |
estimated time | 8am - 4pm | 4 - 12pm | 8am - 4pm | 4pm - 12pm |
MOM | Y. Karadzhov | Y. Karadzhov | Y. Karadzhov | Y. Karadzhov |
Lead shifter | P. Franchini | P. Hanlet | P. Frachini | P. Hanlet |
Shifter | H. Nebrensky | P. Soler | H. Nebrensky | P. Soler |
BLOC | ||||
SOC | ||||
Expert | Y Karadzhov (DAQ) | |||
Aim | Take Data | |||
Beam? | Yes | Yes | Yes | Yes |
Additional Personnel |
Prerequisites¶
Data Requested¶
Beamline Configurations¶
- N.B. Decay Solenoid will not be available.
- We expect to be running with 2V beamloss and beam bump active.
Preparation¶
- We will run beam into the hall so need to secure the MICE Hall
- Target needs to be ready
- BeamLine elements need to be ready
- Detectors need to be ready
- Controls needs to be ready
- DAQ needs to be ready
- OnMon and OnRec need to be ready
- Data Mover needs to be ready
Shifter target training¶
- at shift handover on Saturday - somewhere between 15:00-17:00
DAQ testing¶
- We will take data with TOF0, TOF1 and Ckov. This means that we will use only one LDC (VME crate).
- The main goal of this run is the continue with the commissioning of the new trigger system, and to investigate the stability issue found last weekend.
- We will start with the debugging of the the stability issue. This operation will require unspecified amount of time.
- The beam line will be set for Reference Run without Decay Solenoid.
Reference Run without Decay Solenoid
Particle Species | p at Tgt | p@D1 | p@D2 | p@Tof0 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) |
MeV/c | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | |
pion | 272.42 | 268.67 | 265.98 | 143.4 | 29 | 57.8 | 105.6 | 64.6 | 202.8 | --- | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 | 5729 |
TOF calibration by using the old trigger system.¶
- This calibration will be used for comparison New vs. Old Trigger
- The goal will be to take 30 000 target pulse or more.
- Trigger provided by the old Tr. system.
- The beam line will be set for TOF Calibration run.
TOF Calibration run¶
Number of pulses | Beamloss | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) |
# | V | mm | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # |
30000 | 1 | Positron | 300.0 | 259.7 | 249.58 | 29 | 56.35 | 102.7 | 62.65 | 195.72 | --- | 98.59 | 163.16 | 218.79 | 114.14 | 83.40 | 125.70 | 80.06 | 1678 |
CKOV HV scan run¶
- We also want to do a Ckov HV and momentum scan.
- To be carried out simultaneously and parasitically with the TOF calibration run on electron beam as shown above
- Previous run to be split into 5 runs with 5000 pulses each run, scanning in a range of +- 50 V around nominal settings for CKOV HV settings
Run type | Number of pulses | CKOVa1 | CKOVa2 | CKOVa3 | CKOVa4 | CKOVb1 | CKOVb2 | CKOVb3 | CKOVb4 |
# | V | V | V | V | V | V | V | V | |
Default CKOV HV | 5000 | 1610 | 1520 | 1570 | 1625 | 1540 | 1590 | 1540 | 1495 |
Default CKOV HV - 50V | 5000 | 1560 | 1470 | 1520 | 1575 | 1490 | 1540 | 1490 | 1445 |
Default CKOV HV - 25V | 5000 | 1585 | 1495 | 1545 | 1600 | 1515 | 1565 | 1515 | 1470 |
Default CKOV HV + 25V | 5000 | 1635 | 1545 | 1595 | 1650 | 1565 | 1615 | 1565 | 1520 |
Default CKOV HV + 50V | 5000 | 1660 | 1570 | 1620 | 1675 | 1590 | 1640 | 1590 | 1545 |
CKOV momentum scan run¶
If there is still time to perform more runs, return the CKOV HV to its default settings. Then we will do a momentum scan on the pion momentum. There should be enough statistics with only 2000 actuations each run.
Number of pulses | Particle Species | p at Tgt | p@D1 | p@D2 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Similar Run(s) |
# | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | |
2000 | pion | 300 | 268.67 | 265.98 | 29 | 57.8 | 105.6 | 64.6 | 202.8 | --- | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 | 5729 |
2000 | pion | 325 | 321.5 | 319 | 83 | 69.1 | 126.3 | 77.31 | 246 | --- | 119.6 | 212.4 | 284.8 | 188.9 | 193.7 | 293.2 | 250.6 | 5439 |
2000 | pion | 350 | 346.58 | 344.14 | 83 | 74.5 | 136.1 | 83.3 | 267.7 | --- | 128.8 | 229.2 | 307.4 | 204 | 210.6 | 318.8 | 272.5 | 5444 |
2000 | pion | 375 | 371.6 | 369.2 | 83 | 79.8 | 146 | 89.4 | 290.4 | --- | 137.9 | 246 | 330 | 218.9 | 227.3 | 344.1 | 294.2 | 5442 |
2000 | pion | 400 | 396.7 | 394.3 | 83 | 85.2 | 155.8 | 95.4 | 314.3 | --- | 147.1 | 262.8 | 352.5 | 233.9 | 244 | 369.4 | 315.8 | 5440 |
2000 | pion | 425 | 421.7 | 419.36 | 83 | 90.55 | 165.6 | 101.38 | 339.36 | --- | 156.26 | 279.61 | 374.97 | 248.84 | 260.49 | 394.43 | 337.23 | 5437 |
Finish¶
- Shutdown target and re-open Hall for Monday