Target commissioning + CKOV HV scan - 28th/29th March 2015¶
The purpose of the run is to:¶
Get the system to a state where ToF (and CKOV) Calibration data can be taken
Take some TOF calibration data
Daily schedule¶
Date
Saturday
Saturday
Sunday
Sunday
estimated time
8am - 4pm
4 - 12pm
8am - 4pm
4pm - 12pm
MOM
Y. Karadzhov
Y. Karadzhov
Y. Karadzhov
Y. Karadzhov
Lead shifter
P. Franchini
P. Hanlet
P. Frachini
P. Hanlet
Shifter
H. Nebrensky
P. Soler
H. Nebrensky
P. Soler
BLOC
SOC
R. Bayes
R. Bayes
R. Bayes
R. Bayes
Expert
Y Karadzhov (DAQ)
Aim
Take Data
Beam?
Yes
Yes
Yes
Yes
Additional Personnel
Prerequisites¶
Run Preparation List
Data Requested¶
Beamline Configurations¶
N.B. Decay Solenoid will not be available.
We expect to be running with 2V beamloss and beam bump active.
Preparation¶
We will run beam into the hall so need to secure the MICE Hall
Target needs to be ready
BeamLine elements need to be ready
Detectors need to be ready
Controls needs to be ready
DAQ needs to be ready
OnMon and OnRec need to be ready
Data Mover needs to be ready
Shifter target training¶
at shift handover on Saturday - somewhere between 15:00-17:00
DAQ testing¶
We will take data with TOF0, TOF1 and Ckov. This means that we will use only one LDC (VME crate).
The main goal of this run is the continue with the commissioning of the new trigger system, and to investigate the stability issue found last weekend.
We will start with the debugging of the the stability issue. This operation will require unspecified amount of time.
Reference Run without Decay Solenoid
Number of pulses
Particle Species
p at Tgt
p@D1
p@D2
p@Tof0
Proton Absorber
Q1
Q2
Q3
D1
DS
D2
Q4
Q5
Q6
Q7
Q8
Q9
Similar Run(s)
#
MeV/c
MeV/c
MeV/c
MeV/c
mm
A
A
A
A
A
A
A
A
A
A
A
A
DAQ run #
1 000
pion
272.42
268.67
265.98
143.4
29
57.8
105.6
64.6
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
The beam line will be first set for Reference Run without Decay Solenoid.
Then we will continue with the Ckov momentum scan on the pion momentum
CKOV momentum scan run¶
We will do a momentum scan on the pion momentum. There should be enough statistics with only 2000 actuations each run.
To be carried out simultaneously with the debugging of the stability issue.
Number of pulses
Particle Species
p at Tgt
p@D1
p@D2
Proton Absorber
Q1
Q2
Q3
D1
DS
D2
Q4
Q5
Q6
Q7
Q8
Q9
Similar Run(s)
#
MeV/c
MeV/c
MeV/c
mm
A
A
A
A
A
A
A
A
A
A
A
A
DAQ run #
2000
pion
300
268.67
265.98
29
57.8
105.6
64.6
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
2000
pion
325
321.5
319
83
69.1
126.3
77.31
246
---
119.6
212.4
284.8
188.9
193.7
293.2
250.6
5439
2000
pion
350
346.58
344.14
83
74.5
136.1
83.3
267.7
---
128.8
229.2
307.4
204
210.6
318.8
272.5
5444
2000
pion
375
371.6
369.2
83
79.8
146
89.4
290.4
---
137.9
246
330
218.9
227.3
344.1
294.2
5442
2000
pion
400
396.7
394.3
83
85.2
155.8
95.4
314.3
---
147.1
262.8
352.5
233.9
244
369.4
315.8
5440
2000
pion
425
421.7
419.36
83
90.55
165.6
101.38
339.36
---
156.26
279.61
374.97
248.84
260.49
394.43
337.23
5437
TOF calibration by using the old trigger system.¶
This calibration will be used for comparison New vs. Old Trigger
The goal will be to take 30 000 target pulse or more.
Trigger provided by the old Tr. system.
The beam line will be set for TOF Calibration run.
TOF Calibration run¶
Number of pulses
Beamloss
Particle Species
p at Tgt
p@D1
p@D2
Proton Absorber
Q1
Q2
Q3
D1
DS
D2
Q4
Q5
Q6
Q7
Q8
Q9
Similar Run(s)
#
V
mm
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
DAQ run #
30000
1
Positron
300.0
259.7
249.58
29
56.35
102.7
62.65
195.72
---
98.59
163.16
218.79
114.14
83.40
125.70
80.06
1678
CKOV HV scan run¶
We also want to do a Ckov HV and momentum scan.
To be carried out simultaneously and parasitically with the TOF calibration run on electron beam as shown above
Previous run to be split into 5 runs with 5000 pulses each run, scanning in a range of +- 50 V around nominal settings for CKOV HV settings
Run type
Number of pulses
CKOVa1
CKOVa2
CKOVa3
CKOVa4
CKOVb1
CKOVb2
CKOVb3
CKOVb4
#
V
V
V
V
V
V
V
V
Default CKOV HV
5000
1610
1520
1570
1625
1540
1590
1540
1495
Default CKOV HV - 50V
5000
1560
1470
1520
1575
1490
1540
1490
1445
Default CKOV HV - 25V
5000
1585
1495
1545
1600
1515
1565
1515
1470
Default CKOV HV + 25V
5000
1635
1545
1595
1650
1565
1615
1565
1520
Default CKOV HV + 50V
5000
1660
1570
1620
1675
1590
1640
1590
1545
Q123 Scan¶
We will take data with TOF0 and TOF1, however TOF0 is most important.
The main goal of these operations is to investigate upstream beamline setting (Q1,Q2,Q3). In particular settings with lower current in Q1 are investigated.
This activity will use the new calibrated trigger system.
Reference Run without Decay Solenoid + Runs with modified settings
Run type
Number of pulses
Particle Species
p at Tgt
p@D1
p@D2
p@Tof0
Proton Absorber
Q1
Q2
Q3
D1
DS
D2
Q4
Q5
Q6
Q7
Q8
Q9
Similar Run(s)
#
MeV/c
MeV/c
MeV/c
MeV/c
mm
A
A
A
A
A
A
A
A
A
A
A
A
DAQ run #
Reference
500
pion
272.42
268.67
265.98
143.4
29
57.8
105.6
64.6
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
Lower 1
500
pion
272.42
268.67
265.98
143.4
29
57.8
105.6
64.6
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
Lower 2
500
pion
272.42
268.67
265.98
143.4
29
55.5
104.5
64.3
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
Lower 3
500
pion
272.42
268.67
265.98
143.4
29
53.2
103.5
64.0
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
Lower 1a
500
pion
272.42
268.67
265.98
143.4
29
50.9
102.4
63.6
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
Lower 2a
500
pion
272.42
268.67
265.98
143.4
29
54.9
104.5
64.3
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
Refer 3a
500
pion
272.42
268.67
265.98
143.4
29
49.1
102.4
63.6
202.8
---
100.4
176.8
237.1
157.2
157.6
238.5
203.7
5729
Finish¶
Shutdown target and re-open Hall for Monday