« Previous |
Revision 12/15
(diff)
| Next »
Heidt, Christopher, 29 March 2015 14:13
Target commissioning + CKOV HV scan - 28th/29th March 2015¶
The purpose of the run is to:¶
- Get the system to a state where ToF (and CKOV) Calibration data can be taken
- Take some TOF calibration data
Daily schedule¶
Date |
Saturday |
Saturday |
Sunday |
Sunday |
estimated time |
8am - 4pm |
4 - 12pm |
8am - 4pm |
4pm - 12pm |
MOM |
Y. Karadzhov |
Y. Karadzhov |
Y. Karadzhov |
Y. Karadzhov |
Lead shifter |
P. Franchini |
P. Hanlet |
P. Frachini |
P. Hanlet |
Shifter |
H. Nebrensky |
P. Soler |
H. Nebrensky |
P. Soler |
BLOC |
|
|
|
|
SOC |
R. Bayes |
R. Bayes |
R. Bayes |
R. Bayes |
Expert |
Y Karadzhov (DAQ) |
|
|
|
|
|
|
|
|
Aim |
Take Data |
|
|
|
|
|
|
|
|
Beam? |
Yes |
Yes |
Yes |
Yes |
Additional Personnel |
|
|
|
|
Prerequisites¶
Run Preparation List
Data Requested¶
Beamline Configurations¶
- N.B. Decay Solenoid will not be available.
- We expect to be running with 2V beamloss and beam bump active.
Preparation¶
- We will run beam into the hall so need to secure the MICE Hall
- Target needs to be ready
- BeamLine elements need to be ready
- Detectors need to be ready
- Controls needs to be ready
- DAQ needs to be ready
- OnMon and OnRec need to be ready
- Data Mover needs to be ready
Shifter target training¶
- at shift handover on Saturday - somewhere between 15:00-17:00
DAQ testing¶
- We will take data with TOF0, TOF1 and Ckov. This means that we will use only one LDC (VME crate).
- The main goal of this run is the continue with the commissioning of the new trigger system, and to investigate the stability issue found last weekend.
- We will start with the debugging of the the stability issue. This operation will require unspecified amount of time.
Reference Run without Decay Solenoid
Number of pulses |
Particle Species |
p at Tgt |
p@D1 |
p@D2 |
p@Tof0 |
Proton Absorber |
Q1 |
Q2 |
Q3 |
D1 |
DS |
D2 |
Q4 |
Q5 |
Q6 |
Q7 |
Q8 |
Q9 |
Similar Run(s) |
# |
|
MeV/c |
MeV/c |
MeV/c |
MeV/c |
mm |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
DAQ run # |
1 000 |
pion |
272.42 |
268.67 |
265.98 |
143.4 |
29 |
57.8 |
105.6 |
64.6 |
202.8 |
--- |
100.4 |
176.8 |
237.1 |
157.2 |
157.6 |
238.5 |
203.7 |
5729 |
- The beam line will be first set for Reference Run without Decay Solenoid.
- Then we will continue with the Ckov momentum scan on the pion momentum
CKOV momentum scan run¶
- We will do a momentum scan on the pion momentum. There should be enough statistics with only 2000 actuations each run.
- To be carried out simultaneously with the debugging of the stability issue.
Number of pulses |
Particle Species |
p at Tgt |
p@D1 |
p@D2 |
Proton Absorber |
Q1 |
Q2 |
Q3 |
D1 |
DS |
D2 |
Q4 |
Q5 |
Q6 |
Q7 |
Q8 |
Q9 |
Similar Run(s) |
# |
|
MeV/c |
MeV/c |
MeV/c |
mm |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
DAQ run # |
2000 |
pion |
300 |
268.67 |
265.98 |
29 |
57.8 |
105.6 |
64.6 |
202.8 |
--- |
100.4 |
176.8 |
237.1 |
157.2 |
157.6 |
238.5 |
203.7 |
5729 |
2000 |
pion |
325 |
321.5 |
319 |
83 |
69.1 |
126.3 |
77.31 |
246 |
--- |
119.6 |
212.4 |
284.8 |
188.9 |
193.7 |
293.2 |
250.6 |
5439 |
2000 |
pion |
350 |
346.58 |
344.14 |
83 |
74.5 |
136.1 |
83.3 |
267.7 |
--- |
128.8 |
229.2 |
307.4 |
204 |
210.6 |
318.8 |
272.5 |
5444 |
2000 |
pion |
375 |
371.6 |
369.2 |
83 |
79.8 |
146 |
89.4 |
290.4 |
--- |
137.9 |
246 |
330 |
218.9 |
227.3 |
344.1 |
294.2 |
5442 |
2000 |
pion |
400 |
396.7 |
394.3 |
83 |
85.2 |
155.8 |
95.4 |
314.3 |
--- |
147.1 |
262.8 |
352.5 |
233.9 |
244 |
369.4 |
315.8 |
5440 |
2000 |
pion |
425 |
421.7 |
419.36 |
83 |
90.55 |
165.6 |
101.38 |
339.36 |
--- |
156.26 |
279.61 |
374.97 |
248.84 |
260.49 |
394.43 |
337.23 |
5437 |
TOF calibration by using the old trigger system.¶
- This calibration will be used for comparison New vs. Old Trigger
- The goal will be to take 30 000 target pulse or more.
- Trigger provided by the old Tr. system.
- The beam line will be set for TOF Calibration run.
TOF Calibration run¶
Number of pulses |
Beamloss |
Particle Species |
p at Tgt |
p@D1 |
p@D2 |
Proton Absorber |
Q1 |
Q2 |
Q3 |
D1 |
DS |
D2 |
Q4 |
Q5 |
Q6 |
Q7 |
Q8 |
Q9 |
Similar Run(s) |
# |
V |
mm |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
A |
DAQ run # |
30000 |
1 |
Positron |
300.0 |
259.7 |
249.58 |
29 |
56.35 |
102.7 |
62.65 |
195.72 |
--- |
98.59 |
163.16 |
218.79 |
114.14 |
83.40 |
125.70 |
80.06 |
1678 |
CKOV HV scan run¶
- We also want to do a Ckov HV and momentum scan.
- To be carried out simultaneously and parasitically with the TOF calibration run on electron beam as shown above
- Previous run to be split into 5 runs with 5000 pulses each run, scanning in a range of +- 50 V around nominal settings for CKOV HV settings
Run type |
Number of pulses |
CKOVa1 |
CKOVa2 |
CKOVa3 |
CKOVa4 |
CKOVb1 |
CKOVb2 |
CKOVb3 |
CKOVb4 |
|
# |
V |
V |
V |
V |
V |
V |
V |
V |
Default CKOV HV |
5000 |
1610 |
1520 |
1570 |
1625 |
1540 |
1590 |
1540 |
1495 |
Default CKOV HV - 50V |
5000 |
1560 |
1470 |
1520 |
1575 |
1490 |
1540 |
1490 |
1445 |
Default CKOV HV - 25V |
5000 |
1585 |
1495 |
1545 |
1600 |
1515 |
1565 |
1515 |
1470 |
Default CKOV HV + 25V |
5000 |
1635 |
1545 |
1595 |
1650 |
1565 |
1615 |
1565 |
1520 |
Default CKOV HV + 50V |
5000 |
1660 |
1570 |
1620 |
1675 |
1590 |
1640 |
1590 |
1545 |
Finish¶
- Shutdown target and re-open Hall for Monday
Updated by Heidt, Christopher over 8 years ago
· 12 revisions