1 | 2 | Nebrensky, Henry | h1. 18th March Target Tuning |
---|---|---|---|
2 | 1 | Nebrensky, Henry | |
3 | h2. Preliminary Schedule |
||
4 | |||
5 | 15:00 Target preparation for BPS test |
||
6 | 17:00 Start pre-requisites |
||
7 | 18:00 Hall Activities end: PRY Construction DS Service |
||
8 | 18:00 Start search and secure |
||
9 | 19:00 Start BPS Test Procedure |
||
10 | 20:00 Start Target/Beambump tuning |
||
11 | |||
12 | h2. Activities |
||
13 | |||
14 | h3. BPS Functional test (Craig Macwaters/Ed Overton) |
||
15 | |||
16 | * Prepare target (frame raised) - 2 hrs |
||
17 | * Work through BPS test procedure |
||
18 | |||
19 | h3. Target Tuning (to be confirmed by Ed Overton) |
||
20 | |||
21 | # Work through the target check list and get the target operational with the target frame raised. – 30 mins |
||
22 | # Run target in ISIS at MS/128 for reference - 30 mins |
||
23 | # ISIS double Machine Start frequency - 10 mins |
||
24 | # Check that the target’s insertion aligns with the correct ISIS spill. The target will be operating at the double dip rate. – 10 mins |
||
25 | # Stop operating the target and lower the target frame. Ensure that the target insertion depth is small. (Large BCD) – 10 mins |
||
26 | # With the beam bump on steadily increase the insertion depth (reduce BCD) until we obtain the required 2 V beamloss. – 1 to 2 hours depending |
||
27 | |||
28 | h3. 700 MeV Beamloss/Yield (Henry Nebrensky) |
||
29 | |||
30 | For say 0.5V and 2V loss |
||
31 | * Run target at steady depth, for 50 pulses |
||
32 | * Record accumulated Luminosity Monitor counts off TV scaler |
||
33 | * Compare with Beamline paper to predict expected rate in upcoming runs |
||
34 | 3 | Nebrensky, Henry | |
35 | h3. BLOC Training (Henry Nebrensky) |
||
36 | |||
37 | * Observe target tuning process |
||