Target and Trigger timing + ToF calibration readiness - 8th March 2015¶
The purpose of the run is to:¶
- time the target into the ISIS beam
- time the ToF into the ISIS beam
- BLOC training
- Get the system to a state where ToF (and CKOV) Calibration data can be taken
Daily schedule¶
Month | Sunday | Sunday |
estimated time | 8 - 4pm | 4pm - 12am |
MOM | Y. Karadzhov | Y. Karadzhov |
Lead shifter | C. Heidt | P. Hanlet |
Shifter | K. Long | M. Palmer |
BLOC | ||
SOC | D Rajaram | D. Rajaram |
Expert | P Smith (Target) | Y Karadzhov (DAQ) |
Aim | Check beamline, Close Hall | Take Data |
Beam? | Yes? | Yes? |
Additional Personnel |
Prerequisites¶
SOC Shifts¶
Durga will cover SOC
Shifter hours of service:¶
- Request 1/2 hour shifter overlap for target frame operation training
Data Requested¶
- Reference Run: 6-200 setting w/out DS and PA at 29mm
- Propose to use a pion+ run for data rate studies
Beamline Configurations¶
- N.B. Decay Solenoid will not be available.
- We expect to be running with 2V beamloss and beam bump active.
Reference Run without Decay Solenoid (or Proton Absorber)¶
Particle Species | p at Tgt | p@D1 | p@D2 | p@Tof0 | Proton Absorber | Q1 | Q2 | Q3 | D1 | DS | D2 | Q4 | Q5 | Q6 | Q7 | Q8 | Q9 | Ran? | Similar Run(s) |
MeV/c | MeV/c | MeV/c | MeV/c | mm | A | A | A | A | A | A | A | A | A | A | A | A | DAQ run # | ||
Reference Run w/DS | 202.8 | 1 | 143.4 | 0 | 29 | 57.8 | 105.7 | 64.6 | 202.8 | 0 | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 | Y | 5508 |
muon | 272.42 | 268.67 | 265.98 | 143.4 | 0 | 57.8 | 105.6 | 64.6 | 202.8 | ---- | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 | 5729 | |
electron | 272.42 | 268.67 | 265.98 | 143.4 | 0 | 57.8 | 105.6 | 64.6 | 202.8 | ---- | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 | 5729 | |
Reference Run w/o DS | 202.8 | 1 | 143.4 | 0 | 29 | 57.8 | 105.7 | 64.6 | 202.8 | 0 | 100.4 | 176.8 | 237.1 | 157.2 | 157.6 | 238.5 | 203.7 | Y | 5508 |
Preparation¶
- We will run beam into the hall so need to secure the MICE Hall
- Target needs to be ready
- BeamLine elements need to be ready
- Detectors need to be ready
- Controls needs to be ready
- DAQ needs to be ready
- OnMon and OnRec need to be ready
- Data Mover needs to be ready
Target activity (to be confirmed by Paul Smith)¶
- Work through the target check list and get the target operational with the target frame raised. – 30 mins
- Run target in ISIS at MS/128 for reference - 30 mins
- ISIS double Machine Start frequency - 10 mins
- Check that the target’s insertion aligns with the correct ISIS spill. The target will be operating at the double dip rate. – 10 mins
- Stop operating the target and lower the target frame. Ensure that the target insertion depth is small. (Large BCD) – 10 mins
- With the beam bump on steadily increase the insertion depth (reduce BCD) until we obtain the required 2 V beamloss. – 1 to 2 hours depending
DAQ testing (to be confirmed by Yordan Karadzhov)¶
ToF activity (to be confirmed by Yordan Karadzhov)¶
BLOC training at shift handover (to be confirmed by Henry Nebrensky)¶
Finish¶
- Shutdown target and re-open Hall for Monday