Actions
BLOC Training - 6 March 2015¶
Didn't get to the italic bits. DS takes an hour and a bit...
10:00-10:30 Decay Solenoid¶
- PSU, turret fan, control panel
- Fridge: current leads, Linde PC Warnings and Messages
- Controls – VME PC
10:30-12:00 Hall and Magnets¶
Hall A/C Units- Turning on/off
- Scrolling through alarms
- Refrigerant / ODH
Proton Absorbers ?
Conventional / "Beamline" Magnets- Checklist
- Cooling water
- Temperatures
- Conductivity
- Turning off
- Electricity
- Switch PSUs on/off
- PPS interlocks
- Status Panel and Magnet-On Lamp check
- Controls – VME PC
- POMPOMs
- Receiver
- Purpose
- Monitoring
- Booster
- Purpose
- Monitoring
- Which permits are needed for what
- Reading the crates by eye
- BL/BOBs Test Switch location
- SC Magnet and other PPS featurettes
- How it works
- MOM Walkabout checklist items
- R78
- Mechanical Beamstop removal/replacement
- Swapping power packs
Response procedure - what to do when MLCR rings up in a panic...
Updated by Nebrensky, Henry almost 9 years ago · 4 revisions