Actions
Shifter Training 12th-13th February 2015¶
Schedule¶
Schedule as follows (details for each session are below):
Schedule is still to be confirmed
Monday 9th February¶
Time | Shift A | Shift B |
09:30 | RAL Induction | RAL Induction |
Thursday 12th February¶
Time | Shift A | Shift B |
09:00 | Safety Boots | ISIS Course |
10:30 | ISIS Course | Safety Boots |
11:30 | CDM + PPE | CDM + PPE |
12:00 | MOM slides | MOM slides |
12:30 | Lunch | Lunch |
13:00 | Lunch | Lunch |
13:30 | PPS | Hall Tour |
14:00 | PPS | DAQ |
14:30 | PPS | Online Mon |
15:00 | PPS | Online Reco |
15:30 | PPS | Online Reco |
16:00 | (PPS) Beam stop | C&M |
17:00 | Finish | Finish |
Friday 13th February¶
Time | Shift A | Shift B |
09:00 | DAQ | PPS |
09:30 | Online Mon | PPS |
10:00 | C&M | PPS |
10:30 | Online Reco | PPS |
11:00 | Documentation | Target |
11:30 | Computing Info | Decay Sol |
12:00 | Datamover | Beam Stop |
12:30 | Lunch | BL Magnets |
13:00 | Lunch | Lunch |
13:30 | Target | Lunch |
14:00 | Decay Sol | Documentation |
14:30 | Beam Stop | Computing Info |
15:00 | BL Magnets | Datamover |
15:30 | MOM test | MOM test |
17:00 | Finish | Finish |
Proton Absorbers
Diffusers
Cooling Channel
Trainees¶
- you will need to book into Ridgeway for the Monday night.
- Please let me know if you cannot (or will not) make these dates.
- If you need to do any of the RAL inductions, you will need to be around at 09.30 on Monday morning. The RAL inductions expire after 5 years and the ISIS induction expires after 2 years
Name | Confirmed? | Has CDM Induction? | Has RAL Induction (5 yrs)? | Has ISIS Induction (2 yrs)? | Has Boots? | Notes |
Tanaz Mohayai | Yes | No | No | No | No | IIT grad student |
John Nugent | Yes | Yes | Yes | Yes | Yes | ISIS induction close to expiry |
Chris Heidt | Yes | Yes | Yes | Yes | Yes | |
Holger Witte | Yes | No | No | No | Yes | |
Milorad Popovic | Yes | No | No | No | No | |
Durga Rajaram | Yes | Yes | Yes | No | Yes | |
Paolo Franchini | Yes | No | Yes | No | No | |
Paul Kyberd | Yes | Yes | Yes | No | Yes | |
Ryan Bayes | Yes | Yes | Yes | No | Yes | |
Antonio de Bari | Yes | Yes | No | No | Yes | |
Stefania Ricciardi | Yes | Yes | Yes | No | Yes | |
Jan Greis | Yes | No | Yes | No | No | |
Ray Gamet | No | Yes | Yes | Yes | Yes |
Trainers¶
- Let me know if you have a problem making yourself available on these two days
- Please make sure you are available for the whole day where you are scheduled - to allow for schedule slip etc.
- Please ensure that the system for training on is fully operational.
- If you think that I haven't allowed enough time for training on your system, let me know. I really have no idea how long these things will take. But please stick to time(!)
Name | Subject | Availability | Time Req | Where |
SHE Group | RAL Induction | 60 mins | R12 training room | |
Someone | ISIS Course | 60 mins | R1 - Admin office | |
John Govans | CDM + PPE | 30 mins | Conf Room 9 (R26) | |
Need driver | Safety Boots | 90 mins | Off site | |
MOM | Hall tour | 30 mins | MICE Hall | |
MOM | MOM Slides | 30 mins | Conf Room 9 (R26) | |
MOM | MOM Test | |
Conf Room 9 (R26) | |
Craig on Thurs, Henry on Fri | PPS | |
MICE Hall | |
Henry | Decay Sol | 30 mins | MICE Hall + MLCR | |
Henry | BL Magnets | 30 mins | MICE Hall + MLCR | |
Henry | Target | 30 mins | MLCR, Needs search | |
Henry | Beam stop | 30 mins | MLCR, Needs search | |
Chris Heidt | C&M | 30 mins | MLCR | |
Ed Overton | DAQ | 30 mins | MLCR | |
Rhys Gardener | Online Mon | 30 mins | MLCR | |
Adam Dobbs | Online Reco | 30 mins | MLCR | |
Henry | Datamover | 30 mins | MLCR | |
Ed Overton | Documentation | 30 mins | MLCR | |
Ed Overton | Computing info | 30 mins | MLCR | |
- A good way to introduce this material is to have a talky bit covering all aspects and then give everyone a go
- Needs search - probably best to complete a search during PPS training and then do the beamline bits following. If you have done the computing/DAQ/online reco etc, then it is very nice to set up for a reference run here
Training Documentation (from 2013):¶
- Syllabus for docs and computing info
- Docs: for web start from IIT page; 2 folders in MLCR; check RA/MS (in pocket with ATW)
- [[computing-software:ShifterTraining|Computing Shifter Training]]: KVM; Virtual Desktops; Remote Client Launcher, using eLog (inc. reply and search features); using micewww (inc. getting account); Run Summary Spreadsheet :(
- (Looking at it, the above seem to be prerequisites for the rest. Suspect that in future sessions it would be best to have those with the Hall tour and MOM talk as a "theoretical" session on the Monday p.m. and then the hands-on on the next day or two.)
- [[computing-software:DAQ and online reconstruction training]]
MOM¶
Book the hall- Arrange trainers 1 month in advance
Arrange trainees- Set up schedule
Check RAL/ISIS induction is okayBook meeting rooms- Update training documentation for bits which MOM is doing
- Print training scripts and any other hand outs
Reserve Trainees¶
The following folks requested places, but unfortunately there was not sufficient space for them...
Name | Confirmed? | Has CDM Induction? | Has RAL Induction (5 yrs)? | Has ISIS Induction (2 yrs)? | Has Boots? | Notes |
Adam Dobbs | No | Yes | Yes | Yes | Yes | |
Victoria Blackmore | No | Yes | Yes | No | Yes | ISIS induction close to expiry |
Pierrick Hanlet | No | Yes | Yes | Yes | Yes | ISIS induction close to expiry |
Chris Rogers | No | Yes | Yes | Yes | Yes | |
Mark Palmer | No | No | No | No | No | Leaves on Friday at 11.30 am |
John Govans | No | Yes | Yes | Yes | Yes | |
Janusz Martyniak | No | No | Yes | No | No |
Updated by Rajaram, Durga almost 9 years ago ยท 50 revisions