Actions
BLOC training 22 Jan. 2015¶
9:30ish on - Meet in MLCR and get RADOSes¶
10:00-10:30 Decay Solenoid¶
- PSU, turret fan, control panel
- Fridge: current leads, Linde PC Warnings and Messages
10:30-12:00 ISIS and DSA¶
- Access pre-reqs; conditions
- Geography
- ISIS: LM, Target; frame and limit switches; magnets and barriering
- DSA: POMPOMs; Neutron Monitor; ISIS water and shut-off; PPS & CE (roof); Proton Absorber
Remainder of time: Beamstop and Beamstop Frame
Updated by Nebrensky, Henry almost 9 years ago ยท 4 revisions