BLOC training 22 Jan. 2015

9:30ish on - Meet in MLCR and get RADOSes

10:00-10:30 Decay Solenoid

  • PSU, turret fan, control panel
  • Fridge: current leads, Linde PC Warnings and Messages

10:30-12:00 ISIS and DSA

  • Access pre-reqs; conditions
  • Geography
  • ISIS: LM, Target; frame and limit switches; magnets and barriering
  • DSA: POMPOMs; Neutron Monitor; ISIS water and shut-off; PPS & CE (roof); Proton Absorber

Remainder of time: Beamstop and Beamstop Frame