h1. BLOC training 15 September 2013
2
3
This is a training/revision session for BLOCs.
4 2 Nebrensky, Henry
Anyone who has not gone through the revised [[BLOCtraining|training schedule]] cannot act as BLOC in the upcoming run.
5 1 Nebrensky, Henry
6
I know it's an awkward date - but that's the only time we could get.
7
8
h2. Target & PPS training session 
9
10
h3. PPS (I) - 9:00
11
12
Will run target with Muon Test permit, will cover how to start setting up PPS without mimic.
13
14
h3. Target Theory - 9:30
15
16
0)  a) How the target works (explanation by poster)
17
    b) Control systems and Vac Rack (inc. access)
18
    c) Walkabout checklist items
19
20
1) a) Target powerup (can be done with frame raised)
21
     b) Basic (shifter-level) operation
22
     c) Monitoring plots and reports
23
     d) Checking the Target is operating to the correct spill (can be done with frame raised)
24
     e) Checking the beambump is active
25
     f) PPS interlocks; PPS vs BPS, etc.
26
     g) MICE Controlled Entry procedure
27
28
h3. Dipping into ISIS - 10:00 
29
30
2) a) Finding the ISIS Beam
31
     b) Checking the next spill injection losses (i.e. setting too long or short user delay).
32
     c) Optimising timing (playing with user delay to optimise beam loss profile)  Intrusive / Requires help from ISIS:
33
34
h3. "Intrusive" activities - 11:30
35
36
3) Running without the beambump (and how it changes everything!)
37
     Needs ISIS to turn off beambump temporarily
38
39
4) a) Overview of ISIS BLMs and trips (minor vs major, I forget the terminology)
40
        Would it be possible to get this from Dean Adams or ISIS directly?
41
     b) Run at the margin to try to see some of the minor trips (this would
42
        be better done with the beamloss limit reduced to say 1V to reduce
43
        jitter)
44
45
5) Example of a BPS Trip (and what to do!)
46
47
h2. Magnets - cooling water etc. - after lunch
48 3 Nebrensky, Henry
49 8 Nebrensky, Henry
For future reference, _some of this_ would be done better during the shutdown.
50 7 Nebrensky, Henry
The following probably isn't in chronological order:
51 4 Nebrensky, Henry
52 3 Nebrensky, Henry
h3. Hall A/C Units
53
54
    * Turning on/off
55
56
h3. Decay Solenoid Cryo
57
58
    * Error messages
59
    * Air
60
61
h3. Proton Absorbers
62
63
    * _Cables/readout_
64
65
h3. Beamstop
66
67
    * Mechanical Beamstop removal/replacement
68
    * Swapping power packs
69
70
h3. Conventional / "Beamline" Magnets
71
72
    * Cooling water
73
    ** Temperatures
74
    ** Conductivity
75
    ** Turning off
76
    * Electricity
77
    ** Switch PSUs on/off
78
    ** PPS interlocks
79
    * Controls – VME PCs
80
    * POMPOMs
81
82
h3. Compressed Air
83
84
    * Receiver
85
    ** Purpose
86
    ** Monitoring
87
    * Booster
88
    ** Purpose
89
    ** Monitoring
90
91
h3. PPS (II)
92
93 4 Nebrensky, Henry
    * Which permits are needed for what
94 3 Nebrensky, Henry
    * Test Switch (location)
95
    * _DSA issues_
96
    * SC Magnet and other PPS featurettes
97
98
h3. Response procedure 
99
100
    * what to do when MLCR rings up in a panic...
101
102
h3. ISIS access
103
104
    * procedure and requirements
105
    * geography
106
107 6 Nebrensky, Henry
h3. Paperwork
108
109
* Open discussion of responsibility documents, shift rotas, etc.
110
111 3 Nebrensky, Henry
(aim is to finish before 16:00)