Project

General

Profile

RunPlan20130915 » History » Version 5

Nebrensky, Henry, 03 September 2013 19:53

1 1 Nebrensky, Henry
h1. BLOC training 15 September 2013
2
3
This is a training/revision session for BLOCs.
4 2 Nebrensky, Henry
Anyone who has not gone through the revised [[BLOCtraining|training schedule]] cannot act as BLOC in the upcoming run.
5 1 Nebrensky, Henry
6
I know it's an awkward date - but that's the only time we could get.
7
8
h2. Target & PPS training session 
9
10
h3. PPS (I) - 9:00
11
12
Will run target with Muon Test permit, will cover how to start setting up PPS without mimic.
13
14
h3. Target Theory - 9:30
15
16
0)  a) How the target works (explanation by poster)
17
    b) Control systems and Vac Rack (inc. access)
18
    c) Walkabout checklist items
19
20
1) a) Target powerup (can be done with frame raised)
21
     b) Basic (shifter-level) operation
22
     c) Monitoring plots and reports
23
     d) Checking the Target is operating to the correct spill (can be done with frame raised)
24
     e) Checking the beambump is active
25
     f) PPS interlocks; PPS vs BPS, etc.
26
     g) MICE Controlled Entry procedure
27
28
h3. Dipping into ISIS - 10:00 
29
30
2) a) Finding the ISIS Beam
31
     b) Checking the next spill injection losses (i.e. setting too long or short user delay).
32
     c) Optimising timing (playing with user delay to optimise beam loss profile)  Intrusive / Requires help from ISIS:
33
34
h3. "Intrusive" activities - 11:30
35
36
3) Running without the beambump (and how it changes everything!)
37
     Needs ISIS to turn off beambump temporarily
38
39
4) a) Overview of ISIS BLMs and trips (minor vs major, I forget the terminology)
40
        Would it be possible to get this from Dean Adams or ISIS directly?
41
     b) Run at the margin to try to see some of the minor trips (this would
42
        be better done with the beamloss limit reduced to say 1V to reduce
43
        jitter)
44
45
5) Example of a BPS Trip (and what to do!)
46
47
h2. Magnets - cooling water etc. - after lunch
48 3 Nebrensky, Henry
49 5 Nebrensky, Henry
Some of this would be done better during the shutdown.
50 4 Nebrensky, Henry
51 3 Nebrensky, Henry
h3. Hall A/C Units
52
53
    * Turning on/off
54
55
h3. Decay Solenoid Cryo
56
57
    * Error messages
58
    * Air
59
60
h3. Proton Absorbers
61
62
    * _Cables/readout_
63
64
h3. Beamstop
65
66
    * Mechanical Beamstop removal/replacement
67
    * Swapping power packs
68
69
h3. Conventional / "Beamline" Magnets
70
71
    * Cooling water
72
    ** Temperatures
73
    ** Conductivity
74
    ** Turning off
75
    * Electricity
76
    ** Switch PSUs on/off
77
    ** PPS interlocks
78
    * Controls – VME PCs
79
    * POMPOMs
80
81
h3. Compressed Air
82
83
    * Receiver
84
    ** Purpose
85
    ** Monitoring
86
    * Booster
87
    ** Purpose
88
    ** Monitoring
89
90
h3. PPS (II)
91
92 4 Nebrensky, Henry
    * Which permits are needed for what
93 3 Nebrensky, Henry
    * Test Switch (location)
94
    * _DSA issues_
95
    * SC Magnet and other PPS featurettes
96
97
h3. Response procedure 
98
99
    * what to do when MLCR rings up in a panic...
100
101
h3. ISIS access
102
103
    * procedure and requirements
104
    * geography
105
106
(aim is to finish before 16:00)