Project

General

Profile

RunPlan20130915 » History » Version 3

Nebrensky, Henry, 03 September 2013 19:41

1 1 Nebrensky, Henry
h1. BLOC training 15 September 2013
2
3
This is a training/revision session for BLOCs.
4 2 Nebrensky, Henry
Anyone who has not gone through the revised [[BLOCtraining|training schedule]] cannot act as BLOC in the upcoming run.
5 1 Nebrensky, Henry
6
I know it's an awkward date - but that's the only time we could get.
7
8
h2. Target & PPS training session 
9
10
h3. PPS (I) - 9:00
11
12
Will run target with Muon Test permit, will cover how to start setting up PPS without mimic.
13
14
h3. Target Theory - 9:30
15
16
0)  a) How the target works (explanation by poster)
17
    b) Control systems and Vac Rack (inc. access)
18
    c) Walkabout checklist items
19
20
1) a) Target powerup (can be done with frame raised)
21
     b) Basic (shifter-level) operation
22
     c) Monitoring plots and reports
23
     d) Checking the Target is operating to the correct spill (can be done with frame raised)
24
     e) Checking the beambump is active
25
     f) PPS interlocks; PPS vs BPS, etc.
26
     g) MICE Controlled Entry procedure
27
28
h3. Dipping into ISIS - 10:00 
29
30
2) a) Finding the ISIS Beam
31
     b) Checking the next spill injection losses (i.e. setting too long or short user delay).
32
     c) Optimising timing (playing with user delay to optimise beam loss profile)  Intrusive / Requires help from ISIS:
33
34
h3. "Intrusive" activities - 11:30
35
36
3) Running without the beambump (and how it changes everything!)
37
     Needs ISIS to turn off beambump temporarily
38
39
4) a) Overview of ISIS BLMs and trips (minor vs major, I forget the terminology)
40
        Would it be possible to get this from Dean Adams or ISIS directly?
41
     b) Run at the margin to try to see some of the minor trips (this would
42
        be better done with the beamloss limit reduced to say 1V to reduce
43
        jitter)
44
45
5) Example of a BPS Trip (and what to do!)
46
47
h2. Magnets - cooling water etc. - after lunch
48 3 Nebrensky, Henry
49
h3. Hall A/C Units
50
51
    * Turning on/off
52
53
h3. Decay Solenoid Cryo
54
55
    * Error messages
56
    * Air
57
58
h3. Proton Absorbers
59
60
    * _Cables/readout_
61
62
h3. Beamstop
63
64
    * Mechanical Beamstop removal/replacement
65
    * Swapping power packs
66
67
h3. Conventional / "Beamline" Magnets
68
69
    * Cooling water
70
    ** Temperatures
71
    ** Conductivity
72
    ** Turning off
73
    * Electricity
74
    ** Switch PSUs on/off
75
    ** PPS interlocks
76
    * Controls – VME PCs
77
    * POMPOMs
78
79
h3. Compressed Air
80
81
    * Receiver
82
    ** Purpose
83
    ** Monitoring
84
    * Booster
85
    ** Purpose
86
    ** Monitoring
87
88
h3. PPS (II)
89
90
    * Test Switch (location)
91
    * _DSA issues_
92
    * SC Magnet and other PPS featurettes
93
94
h3. Response procedure 
95
96
    * what to do when MLCR rings up in a panic...
97
98
h3. ISIS access
99
100
    * procedure and requirements
101
    * geography
102
103
(aim is to finish before 16:00)