Run Plan 2011-09-29

  • Training session
  • Test corrections for checklists
  • Show target BPS signal to Mark Arnold
  • Beam bump tests?
  • Crude beamloss study - check Luminosity Monitor calibration - needs detectors for trigger
    • we want to confirm Luminosity Monitor undamaged after MLCR power outages

Paul Smith's plan attached as shift_schedule_2011_09_29.pdf