MICE Shifter Guides

What to do when something happens on shift

Shifter information for various problems that may be encountered on shift

Shifter Instructions or What to Do on Shift

What to do on-shift : MICE Shifter Training

As part of your shift you should keep a record of people present, the main parameters of the
run and incidents that occurred during the run. A good example is shown in the

"Guide to using the eLog for shift":Shifter Elog Guide.pdf

How to launch and work with the Run Control

Using the Run Control GUI [2015]

Shifter checklist : How to start a run

Shifter checklist to start a MICE run - attachment:Shifter_Checklist.pdf

Where to find the CDB Viewer

The CDB Viewer can be found at http://cdb.mice.rl.ac.uk/cdbviewer/

Shifter Target Training and what to do when....

The RATS daemon crashes
A BPS error is encountered

What if one of the MICE thin clients crashes?

Sometimes one the thin clients can crash like this https://micewww.pp.rl.ac.uk/elog/Shift+summary/150623_043853/MICETHIN02_error_230615.JPG

The current response to this is :

If the applications that had been running on the machine can just be opened elsewhere, then they should be, and an email
should be sent to the online expert (Paolo). If the process hasn't been released by the machine, and can't be run
in multiple instances (i.e. RunControl) then the SOC should be called, who will in turn probably call the online
expert.