Actions
MICE Muon Beamline Experts (BLOCs) » History » Revision 8
« Previous |
Revision 8/10
(diff)
| Next »
MOM, Mice Operations Manager, 07 June 2016 14:37
ISIS and DSA access
MICE Muon Beamline On-Call (BLOCs)¶
- Beamline Status
- Scope of BLOC role
- BLOC training
- Responsibilities
- Syllabus
- BLOCs
- Procedures
- What the BLOC does for a MICE run
- What to do if target fails
- Moving Dipoles
- Routine POMPOM sensor tests
- What to check when a conventional magnet trips
- What to check if the Decay Solenoid PSU trips
- Accessing the ISIS Synchrotron
- Accessing the DSA
- Protocol for removing the Beamstop Frame
- Target Gate Valve
- Control crates
- Misc
- Pneumatic Proton Absorbers - dimensions (I will move this link at some point)
- Borated Polythene specs (I will move this link at some point)
- Gaussmeter GM08
- Beamline Shift Schedule
Updated by MOM, Mice Operations Manager almost 7 years ago · 8 revisions