MICE Muon Beamline Experts (BLOCs) » History » Version 10

Nebrensky, Henry, 16 May 2018 09:41
Proton Absorbers

1 6 Nebrensky, Henry
h1. MICE Muon Beamline On-Call (BLOCs)
2 1 Boyd, Steven
3
* [[BLOCbeamlineStatus|Beamline Status]]
4
* Scope of BLOC role
5
* BLOC training
6
** [[BLOCresponsibilities|Responsibilities]]
7
** [[BLOCtraining|Syllabus]]
8
** BLOCs
9
* Procedures
10 2 Nebrensky, Henry
** [[BeamlineProcsShift|What the BLOC does for a MICE run]]
11 1 Boyd, Steven
** [[BeamlineProcsTargetFail|What to do if target fails]]
12
** [[BeamlineProcsTestPOMPOMs|Routine POMPOM sensor tests]]
13
** [[BeamlineProcsEarthLeakTrip|What to check when a conventional magnet trips]]
14
** [[BeamlineProcsDSThermalTrip|What to check if the Decay Solenoid PSU trips]]
15 9 MOM, Mice Operations Manager
** [[BeamlineProcsBSrestraintFrame|Protocol for removing the Beamstop Frame]]
16 8 MOM, Mice Operations Manager
** [[Access_to_ISIS_Synchrotron|Accessing the ISIS Synchrotron]]
17
** [[Access_to_DSA|Accessing the DSA]]
18 9 MOM, Mice Operations Manager
** [[BeamlineProcsDipoleMove|Moving Dipoles]]
19 1 Boyd, Steven
** [[BeamlineProcsTargetGateValve|Target Gate Valve]]
20
** [[BeamlineProcsVMEcrateFail|Control crates]]
21 5 Nebrensky, Henry
*** [[BeamlineProcsTargetCrateRestart|Restarting the VME controller for the target]]
22 10 Nebrensky, Henry
* Proton Absorbers
23 3 Nebrensky, Henry
** [[BeamlineDocsProtonAbsorbers|Pneumatic Proton Absorbers - dimensions]] (I will move this link at some point)
24 1 Boyd, Steven
** [[BeamlineDocsBoratedPE|Borated Polythene specs]] (I will move this link at some point)
25 10 Nebrensky, Henry
** [[r9-hall-operations:ProtonAbsorber| Construction documents]]
26
* Misc
27 1 Boyd, Steven
** [[BeamlineDocsGaussmeterGM08|Gaussmeter GM08]]
28
** [[BeamlineShifts|Beamline Shift Schedule]]