Project

General

Profile

FF 20130409 » History » Version 4

Rogers, Chris, 07 January 2015 17:22

1 1 Rogers, Chris
h1. FF 20130409
2
3
Present:
4
5
* Chris Rogers
6
* Henry Nebrensky
7
* John Palin
8
9
During visit to MICE hall:
10
11
* Discussion on survey data
12
** Survey produces xit format which appears to be proprietary binary format - requires Spatial Analyzer tool developed by New River Kinematics www.kinematics.com; DL survey crew have a licence, Jason Tarrant may also have a licence.
13
*** What if they go out of business?
14
** Each new survey results in a new xit file
15
*** No clear dissemination/back up policy on these files
16 2 Nebrensky, Henry
*** Outline agreement that copies of these should be stored on MOM laptop which is backed up
17
*** either emailed to MOM after each survey, or MOM can put them on a USB stick before surveyor leaves RAL   
18 1 Rogers, Chris
** Did not discuss how survey should be documented; but documentation is probably required
19
** Established that the survey coordinates are either left-handed or right-handed (and a conversion is not trivial) - but not which one. Presumably this comes through from the CAD model anyway.
20
21
* Discussion on survey details
22
** Centre line D2-MICE-beamline
23 4 Rogers, Chris
*** *X* axis (D2-MICE-beamline) defined by least squares fit to quadrupole _mirror-plate_ apertures for Q4-9
24 3 Nebrensky, Henry
*** define line-on-floor by looking at reference points on floor - brass plate under D2; floor target(sticker) in front of Q4; floor target(sticker) below the Ckovs
25 4 Rogers, Chris
*** *Z* axis is defined by fitting to plane that includes line-on-floor and D2-MICE-beamline; and taking a line in that plane that is perpendicular to D2-MICE-beamline
26 1 Rogers, Chris
** Some discussion - how do we get a handle on where D1-D2 line is pointing wrt D2-MICE-beamline?
27 2 Nebrensky, Henry
*** Proposed measuring around solenoid exit aperture and taking the mean to get a handle on solenoid downstream end placement
28
**** This requires removing the Proton Absorbers and possibly GVA1; hope to do this within the pneumatic proton absorber upgrade process. Hopefully PA apertures would end up aligned on beam centre
29 1 Rogers, Chris
*** No clear technique for getting the upstream end placement
30
*** Noted that it was not clear that the D1-D2 line sits in the x-y plane as defined above; and this should not be assumed (if possible)
31
** And finally
32
*** Emphasised that of all beamline components, TOF positions are most crucial to measure well.
33 4 Rogers, Chris
34
For reference, note that the _surveyor's_ co-ordinate system for the MICE Hall and Cooling Channel is as follows:
35
* *X* is along beamline with beam travelling in positive direction
36
* *Y* is across beamline; positive points south (towards MLCR)
37
* *Z* is vertical with up in positive direction