Actions
Daily Hall Meeting-2017-09-14¶
09.30 ISIS coffee lounge¶
http://mice.iit.edu/phonebridge.html
CW, SB, CMcW, KL,
Tasks¶
- H2
- cooling - H2 meeting 2pm today.
- Magnets.
- failover water.
- plumbing now
- A Gallagher UPS wiring.
- dependant other ops low priority - low current tests
- vacuum interlock - hardware problem.
- water interlock solved.
- failover water.
- Tracker
- require update on connector swaps. to be completed
- EMR
operational - intermittent fault. nothing current - watch
- DS interlocks
re-boot - AG to help.
- Beam-bump
10am. tuning for 3V loss.
- Beam - mock-data 8 hrs. 4pm finish. Straight track calibration?
- AOB. -
Meeting Dial-in Information
Access code: 1779339517
Dial-in Numbers:
UK 08082380274
US 631.621.5253
Updated by Whyte, Colin about 6 years ago · 2 revisions