Project

General

Profile

Actions

Daily Hall Meeting-2017-09-14

09.30 ISIS coffee lounge

http://mice.iit.edu/phonebridge.html

CW, SB, CMcW, KL,

Tasks

  • H2
    • cooling - H2 meeting 2pm today.
  • Magnets.
    • failover water.
      • plumbing now
      • A Gallagher UPS wiring.
    • dependant other ops low priority - low current tests
      • vacuum interlock - hardware problem.
      • water interlock solved.
  • Tracker
    • require update on connector swaps. to be completed
  • EMR
    operational - intermittent fault. nothing current - watch
  • DS interlocks
    re-boot - AG to help.
  • Beam-bump
    10am. tuning for 3V loss.
  • Beam - mock-data 8 hrs. 4pm finish. Straight track calibration?
  • AOB. -

Meeting Dial-in Information

Access code: 1779339517
Dial-in Numbers:

UK 08082380274
US 631.621.5253

Updated by Whyte, Colin about 6 years ago · 2 revisions