Control Room Operations » History » Revision 19
Revision 18 (Boyd, Steven, 12 September 2016 08:32) → Revision 19/23 (Boyd, Steven, 12 September 2016 08:47)
h1. Control Room Operations
* Control room map and computer use
** attachment:MLCR_Plan.png
** Do not open instances of the same application on different machines if possible. This leads to confusion and can be
dangerous. Please adhere to the terminal usage plan in the MLCR plan above.
* Controls and Monitoring
** "Run Control instructions":http://micewww.pp.rl.ac.uk/attachments/5360/Run_Control_Instructions_v4.pdf
** "Using the alarm handler":https://micewww.pp.rl.ac.uk/projects/cm/wiki/Alarm_handler#How-to-deal-with-an-alarm
** "Safety and emergency documentation":http://micewww.pp.rl.ac.uk/projects/operations/wiki#Safety-Information
** Issues to watch out for
*** Cooling water leaks
*** Conventional magnet trips
*** Make sure that the File Compactor is cycling properly at the end of each run and that the data is being transferred
*** Cross check the CDB with the end of run statistics
* [[computing-software:DAQ_and_online_reconstruction_training#DAQ|DAQ]]
* document#22
* [[computing-software:DAQ_and_online_reconstruction_training#Online-reconstruction|Online Reconstruction]]
* [[ShifterTrainingFileCompactor|Datamover]]
* "Documentation":http://micewww.pp.rl.ac.uk/projects/operations/wiki/MICE_Subsystem_Documentation
* [[computing-software:ShifterTraining|Computing]]