Project

General

Profile

Control Room Operations » History » Version 17

Boyd, Steven, 16 August 2016 11:58

1 1 Boyd, Steven
h1. Control Room Operations
2
3 16 Boyd, Steven
* Control room map and computer use
4
** attachment:MLCR_Plan.png
5 17 Boyd, Steven
** Do not open instances of the same application on different machines if possible. This leads to confusion and can be
6
dangerous. Please adhere to the terminal usage plan in the MLCR plan above.
7 1 Boyd, Steven
* Controls and Monitoring
8 8 Franchini, Paolo
** "Run Control instructions":http://micewww.pp.rl.ac.uk/attachments/5360/Run_Control_Instructions_v4.pdf
9 6 Franchini, Paolo
** "Using the alarm handler":https://micewww.pp.rl.ac.uk/projects/cm/wiki/Alarm_handler#How-to-deal-with-an-alarm
10 12 Boyd, Steven
** "Safety and emergency documentation":http://micewww.pp.rl.ac.uk/projects/operations/wiki#Safety-Information
11 2 Boyd, Steven
** Issues to watch out for
12
*** Cooling water leaks
13 1 Boyd, Steven
* [[computing-software:DAQ_and_online_reconstruction_training#DAQ|DAQ]]
14 10 Franchini, Paolo
* document#22
15 1 Boyd, Steven
* [[computing-software:DAQ_and_online_reconstruction_training#Online-reconstruction|Online Reconstruction]]
16
* [[ShifterTrainingFileCompactor|Datamover]]
17 14 Boyd, Steven
* "Documentation":http://micewww.pp.rl.ac.uk/projects/operations/wiki/MICE_Subsystem_Documentation
18 1 Boyd, Steven
* [[computing-software:ShifterTraining|Computing]]