BLOCbeamlineStatus » History » Version 6
Nebrensky, Henry, 27 March 2015 18:22
Linde service finished
1 | 1 | Nebrensky, Henry | h1. Status of MICE Muon Beamline |
---|---|---|---|
2 | 2 | Nebrensky, Henry | |
3 | 1 | Nebrensky, Henry | {{>toc}} |
4 | |||
5 | This list is for tracking the state between BLOCs, and should be viewed before an expert is called. This is complementary to the whiteboard in the control room. |
||
6 | |||
7 | h2. Access / Construction Work |
||
8 | |||
9 | * Hall is open. |
||
10 | * PRY construction continues - hence crane activity |
||
11 | |||
12 | h2. Interlocks and Controls |
||
13 | |||
14 | * Target gate valve is open |
||
15 | * Beamstop is closed |
||
16 | |||
17 | h2. Services (electricity / water / air / air-conditioning / network) |
||
18 | |||
19 | * No service interuptions scheduled. |
||
20 | * Airconditioning unit 1 is isolated, the others are operational. |
||
21 | |||
22 | h2. Systems |
||
23 | |||
24 | * Beamline: |
||
25 | 4 | Nebrensky, Henry | ** The beamline polarity is set to positive polarity |
26 | ** A new control board has been installed in Q5 MPS to solve ramping issue. |
||
27 | 1 | Nebrensky, Henry | * DS: |
28 | 6 | Nebrensky, Henry | ** The Linde Fridge is cooling down after being serviced |
29 | ** The PSU has undergone a full-current stability test |
||
30 | 3 | Nebrensky, Henry | *** If it trips on overtemperature, leave as-is (do NOT reset interlocks) so that the specific channel can be identified |
31 | 1 | Nebrensky, Henry | * Proton Absorber: |
32 | ** need to further close damping valves |
||
33 | * Beamstop: |
||
34 | ** Powerpack 2 has a cracked hose fitting awaiting replacement and is out of use |
||
35 | * MLCR: |
||
36 | ** No issues |