DS warm-up

1 1 Nebrensky, Henry
h1. Status of MICE Muon Beamline
2 2 Nebrensky, Henry
3 1 Nebrensky, Henry
{{>toc}}
4
5
This list is for tracking the state between BLOCs, and should be viewed before an expert is called.  This is complementary to the whiteboard in the control room.
6
7
h2. Access / Construction Work
8
9
* Hall is open.
10
* PRY construction continues - hence crane activity
11
12
h2. Interlocks and Controls
13
14
* Target gate valve is open
15
* Beamstop is closed
16
17
h2. Services (electricity / water / air / air-conditioning / network)
18
19
* No service interuptions scheduled.
20
* Airconditioning unit 1 is isolated, the others are operational.
21
22
h2. Systems
23
24
* Beamline:
25 4 Nebrensky, Henry
** The beamline polarity is set to positive polarity
26
** A new control board has been installed in Q5 MPS to solve ramping issue.
27 1 Nebrensky, Henry
* DS:
28 5 Nebrensky, Henry
** The Linde Fridge is off and warming up for service 
29 3 Nebrensky, Henry
** The PSU is undergoing a full-current stability test
30
*** If it trips on overtemperature, leave as-is (do NOT reset interlocks) so that the specific channel can be identified 
31 1 Nebrensky, Henry
* Proton Absorber:
32
** need to further close damping valves
33
* Beamstop:
34
** Powerpack 2 has a cracked hose fitting awaiting replacement and is out of use 