h1. Status of MICE Muon Beamline
2
{{>toc}}
3
4
This list is for tracking the state between BLOCs, and should be viewed before an expert is called.  This is complementary to the whiteboard in the control room.
5
6
h2. Access / Construction Work
7
8
* Hall is open.
9
* PRY construction continues - hence crane activity
10
11
h2. Interlocks and Controls
12
13
* Target gate valve is open
14
* Beamstop is closed
15
16
h2. Services (electricity / water / air / air-conditioning / network)
17
18
* No service interuptions scheduled.
19
* Airconditioning unit 1 is isolated, the others are operational.
20
21
h2. Systems
22
23
* Beamline:
24
** The beamline polarity is set to mixed polarity
25
** Control boards have been swapped between Q4 and Q5 MPS to look into ramping issue.
26
* DS:
27
** The Linde Fridge is running 
28
** The PSU is isolated from the DS, and undergoing testing to look for overtemperature trips.
29
*** If it trips, leave as-is (do NOT reset interlocks) so that the specific channel can be identified 
30
* Proton Absorber:
31
** need to further close damping valves
32
* Beamstop:
33
** Powerpack 2 has a cracked hose fitting awaiting replacement and is out of use 
34
* MLCR:
35
** No issues