Ops/Comm Scheduling meeting : 19/12/2017

Location : CR21 at 14:00 pm

Phone access : phonebridge number
UK: 08082380274
US: 631.621.5253
Access code: 1779339517

  • MOM Update
  • Data quality
    • Detectors : Durga attachment:Run10489.pdf
    • Target : Joe
    • Physics shifter report
  • RAL Christmas shutdown plans and supervision
    • SS magnets and Focus coil
    • Beamline conventional magnets
    • Water cooling system
    • Decay Solenoid
    • Beamstop
      • Closed with mechanical frame installed.
    • TOF/EMR/KL/CKOV ( gas / power )
    • Trackers (gas / cryo / power )
    • Target
    • Hall
    • Electronics room
  • January jobs:
    • POMPOM tests 25th-26th Sept
    • D2/D1 field mapping
    • PPS Functional Test
    • DSA PPS work (ISIS) 19th
    • Synch closure 24th?
  • Next meeting - if required - on Jan 9
  • AOB