Project

General

Profile

Actions

20171219 » History » Revision 16

« Previous | Revision 16/22 (diff) | Next »
Boyd, Steven, 19 December 2017 12:40


Ops/Comm Scheduling meeting : 19/12/2017

Location : CR21 at 14:00 pm

Phone access : phonebridge number
UK: 08082380274
US: 631.621.5253
Access code: 1779339517

  • Mom Update
  • Data quality
    • Detectors : Durga attachment:Run10489.pdf
    • Target : Joe
    • Physics shifter report
  • RAL Christmas shutdown plans and supervision
    • Prejudice is to shutdown as usual over Christmas and consider longer term plans in the New Year
    • SS magnets and Focus coil
    • Beamline conventional magnets
    • Water cooling system
    • Decay Solenoid
    • Beamstop
      • Closed with mechanical frame installed.
    • TOF/EMR/KL/CKOV ( gas / power )
    • Trackers (gas / cryo / power )
    • Target
    • Hall
    • Electronics room
  • January jobs:
    • POMPOM tests 22nd-23rd Jan. (Henry)
    • D2/D1 field mapping (Paolo)
    • Earth Leakage measurements?
    • PPS Functional Test ???
    • DSA PPS work (ISIS) 19th
    • Synch closure 24th
    • SSU CC5 change?
    • Channel 3T test?
  • Next meeting - if required - on Jan 9
  • AOB

Updated by Boyd, Steven almost 6 years ago · 16 revisions