Ops/Comm Scheduling meeting : 24/10/2017

Location : CR21 at 14:00 pm

Phone access : phonebridge number
UK: 08082380274
US: 631.621.5253
Access code: 1779339517

Name Task Time required
Henry Restart conventional magnet controls crate 1-2 hours (?)
Josef Replace filters in 8 compressors on mezzanine 1-2 days
Ajit Test AMI controllers 0.5 - 1 day
Mark Partial warming of DS to clean vacuum space and recool 10 days
Ajit/MOM Review current alarms 1 day
Joe/Henry Change target patch fibres 0.5 days
John/Colin Hall AC work? ?
  • Others?
  • Run Plan (not sure how current this now): 2017-09-28-Detailed-RunPlan-v7.xlsx
  • Plans for next user cycle : 2017/03 : Nov 14 - Dec 20
    • We have permission to run in the next user cycle.
    • Plan is to take data with empty LH2 absorber, and with LiH absorber with M2 (plus other measurements if time and manpower is available)
    • Shifts are now open. Please sign up. 16/48 shifts have been assigned.
    • MOMs will be : Durga, Victoria+Melissa, Paolo
    • Run up will probably be on Nov 14th with data-taking starting on Nov 15th.
  • AOB