h1. Ops/Comm Scheduling meeting : 23/5/2017
2
3
Location : CR21 at 14:00 pm
4
5
Phone access :  *New* phonebridge number
6
UK: 08082380274
7
US: 631.621.5253
8
Access code: 1779339517
9
10
h2. Agenda
11
12
* Actions
13
** -Macwaters - Re-make dodgy compressor2 remote cable connector - stands-
14
** Macwaters - Remove old overheated CSW71 to R9 _waiting for John Govans and the van_ - in progress
15 4 Boyd, Steven
** -Ajit - Implement MOM/DC state machine override function for all systems; also need documentation and training for operators - documentation and training in progress-
16 1 Boyd, Steven
** Macwaters - Report on status of FC psu repair (stands)
17
*** The spare is installed and has been run into a short 
18
** Hall Manager - water system change-over procedure (stands) - _collar people on Friday_
19
** EOverton - Status of @miceraid5@ disk cleanup (stands) _now has a script but needs to run it_
20
** Progress on Hall list  [[Hall_Task_List_Spring17|List of Hall activities in the shutdown]] (Colin) _DL were down on masse and made significant progress. Need to confirm if any remaining items_
21
** CWhyte to request survey of TOF1 - _requested, next week as Tony off this week_
22
** SBoyd to ensure we get updates on detector/data quality and on Target performance at Ops meetings
23
** AKurup to check which settings are being used by the active Alarm Handlers
24
** SBoyd to conscript extra shift cover for the end of next week : Done. Need BLOCs for the 31/1 and 2 of June (i.e. end of cycle)
25
26
* DC update
27
* MOM update
28 5 Rajaram, Durga
* Performance plots from TOF calibration run (Durga?) attachment:Onrec-9297.pdf
29 2 Boyd, Steven
* Update on the tracker saga
30 1 Boyd, Steven
* Hydrogen system update
31
* Run plan
32
** Tracker may be ready to operate on Friday
33
*** Is there still Helium in the tracker?
34
** LH2 running will not happen this cycle
35
** Extraction of LH2 absorber, re-insertion of the FC and establishment of the magnetic channel: Thursday (25May17)—Saturday (27May17);
36
** Magnet commissioning: Sunday (28May17)—Monday (29May17); and
37
** Empty-channel data taking (Monday 29May17)—Friday (02Jun17).
38 3 Boyd, Steven
** Last training date on Friday. I've asked shifters to meet the MOM on Friday to assess training plans. The MOM should set a time for this meeting.
39 1 Boyd, Steven
* AOB
40
41
* Last meeting : [[20170516|Tuesday May 9 2017]]
42
* Next meeting : [[20170530|Tuesday May 30 2017]] 
43 6 Nebrensky, Henry
44
h3. Minutes
45
46
* Actions
47
** Macwaters - Remove old overheated CSW71 to R9 _waiting for John Govans and the van_ - in progress
48
** Macwaters - Report on status of FC psu repair (stands)
49
*** The spare is installed and has been run into a short 
50
** Hall Manager - water system change-over procedure (stands) - _collar people on Friday_
51
** EOverton - Status of @miceraid5@ disk cleanup (stands) _now has a script but needs to run it_
52
** Progress on Hall list  [[Hall_Task_List_Spring17|List of Hall activities in the shutdown]] (Colin) _DL were down on masse and made significant progress. Need to confirm if any remaining items_
53
** CWhyte to request survey of TOF1 - _requested, due Thursday_ Removing absorber means will need to re-survey CC magnets after the User Cycle.
54
** SBoyd to ensure we get updates on detector/data quality and on Target performance at Ops meetings
55
** AKurup to check which settings are being used by the active Alarm Handlers
56
** SBoyd to conscript extra shift cover for the end of next week : Done. Need BLOCs for the 31/1 and 2 of June (i.e. end of cycle)
57
*** BLOCs at end of cycle will be shared between Ray and Henry. Note that both Tanaz and Ray/Henry are on day shift, so if they are called out during the night then MICE will need the stand-by shifter 
58
59
* New actions
60
** CWhyte to request survey of CC Magnets after cycle
61
** FDrielsma to investigate low-efficiency channels in EMR x-z
62
** Tracker group: decide what should be done to prevent repeat contamination of Tracker Cryostats  
63
64 7 Nebrensky, Henry
* DC update
65
  Work is on Hydrogen and Tracker: see below
66
67
* MOM update
68
  Ed starts as MOM tomorrow 
69
70 8 Nebrensky, Henry
* Target performance plots: see attachment:S19.pdf
71 7 Nebrensky, Henry
  Looks fine - leave it to carry on
72 8 Nebrensky, Henry
  
73 7 Nebrensky, Henry
* Performance plots from TOF calibration run (Durga): see attachment:Onrec-9297.pdf
74
  TOF0 - hope to get calibration in the 3 missing slots. TOF2 - waiting for re-calibration process to finish.
75 1 Boyd, Steven
  EMR has some low-efficiency channels in the x-z view right where the beam arrives - should investigate.
76 7 Nebrensky, Henry
77
* Update on the tracker saga
78 8 Nebrensky, Henry
79 7 Nebrensky, Henry
* Hydrogen system update
80 6 Nebrensky, Henry