1 | 1 | Boyd, Steven | h1. Ops/Comm Scheduling meeting : 2/5/2017 |
---|---|---|---|
2 | |||
3 | Location : CR21 at 14:00 pm |
||
4 | |||
5 | Phone access : *New* phonebridge number |
||
6 | UK: 08082380274 |
||
7 | US: 631.621.5253 |
||
8 | Access code: 1779339517 |
||
9 | |||
10 | h2. Agenda |
||
11 | |||
12 | * Actions |
||
13 | 9 | Boyd, Steven | ** -Macwaters & Boehm - Arrange to install new Sumitomo compressor adsorbers - stands- |
14 | 1 | Boyd, Steven | ** Macwaters - Re-make dodgy compressor2 remote cable connector - stands |
15 | 9 | Boyd, Steven | ** Macwaters - Remove old overheated CSW71 to R9. Speak to Sumitomo on April 5th regards how to repair. - in progress |
16 | ** -Macwaters - Replace old vac sensors and new valve on cryo 1&2 - in progress- |
||
17 | 1 | Boyd, Steven | ** Ajit - Implement MOM/DC state machine override function for all systems; also need documentation and training for operators - documentation and training in progress |
18 | ** Macwaters - Report on status of FC psu repair (stands) |
||
19 | *** *This needs to be cross-checked* - e.g. Josef Boehm to check with Trevor. What is plan when it does return - will we want to test it _in situ_ before the run? |
||
20 | 7 | Boyd, Steven | *** _Josef :"we just run 50A through it when it is connected to the magnet"_ |
21 | 1 | Boyd, Steven | ** Hall Manager - water system change-over procedure (stands) |
22 | ** EOverton - Status of @miceraid5@ disk cleanup (stands) |
||
23 | ** JBoehm & Macwaters - get the West Wall compressors correctly labelled, as various have been re-purposed (stands) |
||
24 | 9 | Boyd, Steven | ** -CWhyte to contact DL to clarify their [[Hall_Task_List_Spring17|Hall Task List]] items- |
25 | 1 | Boyd, Steven | ** The Picologger has been disconnected. SBoyd to check with CWhyte whether we want it or not |
26 | 7 | Boyd, Steven | *** _Contacted Colin/Josef : Josef will meet with John Cobb on Friday to discuss this in the context of ramping the FC_ |
27 | 9 | Boyd, Steven | ** -HNebrensky to send BLOC-chasing email- |
28 | 1 | Boyd, Steven | |
29 | * DC Update |
||
30 | * LH2 Update |
||
31 | 2 | Boyd, Steven | * Tracker Update |
32 | 1 | Boyd, Steven | * [[Hall_Task_List_Spring17|List of Hall activities in the shutdown]] (Colin) |
33 | * Schedule for startup |
||
34 | 8 | Boyd, Steven | ** Startup run on Monday May 8th - Hall should be reserved for operations activities all day. Controlled Entry is possible |
35 | but only when permitted by the MOM. |
||
36 | 5 | Boyd, Steven | ** We will *not* be running the SS magnets this user cycle, or taking data with Neon. |
37 | ** We will need to run the FC at some point. |
||
38 | ** Co-ordination between DC and MOM will be key. |
||
39 | 1 | Boyd, Steven | |
40 | AOB: |
||
41 | |||