20170131 » History » Version 18

Nebrensky, Henry, 31 January 2017 19:10

1 1 Boyd, Steven
h1. Ops/Comm Scheduling meeting
2
3 2 Boyd, Steven
Location : G06 in R66 at 2pm
4 1 Boyd, Steven
5
Phone access :  ReadyTalk number 
6
US 866-740-1260
7
UK 0800-496-0576
8
Swiss 0800-70-53-51
9
Italy 800182592
10
Access Code: 2155402
11
12
* SS Magnet status
13
* Hydrogen status
14
* Issues arising from previous running
15 4 Boyd, Steven
** [[Hall_Task_List_Dec16Feb17|Shutdown work in Jan and Feb]]: "present version":https://micewww.pp.rl.ac.uk/attachments/download/8158
16 1 Boyd, Steven
* Operations :
17 6 Boyd, Steven
** C&M System Check report (Ajit/Ed)
18 1 Boyd, Steven
** Establishing a timetable for the runup : when should systems (including magnets) be ready for running?
19
*** Beam schedule
20
**** Run up on Jan 30 - Feb 12.
21
**** Start of user cycle : Feb 14
22
**** Start of data-taking : Feb 15
23 14 Boyd, Steven
*** Reserve shifter support from Feb 10 - Feb 14 
24 1 Boyd, Steven
*** MOM formally starts on Feb 9 (but should be present for the runup activities but will not be on 24-hour call)
25
*** Possible runup plan (framework for discussion)
26 7 Boyd, Steven
**** Monday 6th : Preparation meeting with Ed/Ajit/Colin/Josef/Others to go over readiness for running
27 15 Boyd, Steven
**** Tuesday 7th (subject to meeting on Monday) : Bring up magnets to running configuration, take some pulser data and take magnets down
28 5 Boyd, Steven
**** Saturday 11th : Expert led run without solenoids + Beam tune
29
**** Monday 13th : Triage actions arising from expert led run
30 8 Boyd, Steven
**** Tuesday 14th : Bring up magnets in the evening and monitor overnight by reserve shift.
31 16 Boyd, Steven
**** Wednesday 15th : Data-taking start at 08:00 
32 1 Boyd, Steven
33
** Shift signup for first half of Feb is viable now (but not full)
34
35 10 Boyd, Steven
| *Shift Block ID*   | # signed up  |  # shifters still needed  | 
36 1 Boyd, Steven
|         1          |     6        |            0              |
37 11 Boyd, Steven
|         2          |     4        |            2              | *Need one overnight shift per night (5 nights) for monitoring* |
38
|         3          |     4        |            2              | *Need one overnight shift per night (5 nights) for monitoring* |
39 1 Boyd, Steven
|         4          |     4        |            1              |
40
41 12 Boyd, Steven
*Magnet monitors do not need to be trained shifters*
42
43 13 Boyd, Steven
** BLOCs are needed : Feb 20 - 24 and Feb 27 - Mar 1
44 1 Boyd, Steven
45
* AOB:
46
47
* Last meeting : [[20170124|Tuesday Jan 24 2017]]
48
* Next meeting : [[20170206|Tuesday Feb 6 2017]]
49 17 Nebrensky, Henry
50
h2. Minutes
51
52
* CC Magnet status (J Boehm)
53
  All 3 CC magnets are now in flip mode; cold and full of helium. Everything is presently being run into shorts for the CC IOC testing.
54
  Handover from Pierrick is in progress. A few GUIs have been changed.
55
  Are seeing instability in SSU power supply (into shorts): last week suddenly ramped from 150 to 215 A; lost control of GUI; ramped down manually.
56
  Similar last night, with control cables disconnected from the AMI controller - again unstable and major changes in current on its own, implies a hardware issue.
57
  Now running with a different controller - seeing issues still. May possibly be associated with a purely resistive load.  
58
59
* Hydrogen status (M Tucker)
60
  Cooled down in R9 with Neon, made 2 to 2.5 litres of liquid, less than 1 K difference between condenser and absorber.
61
  Expect about 1 l every 6 hours, so over 5 days to fill with LH2 needing a 24hour rota. 
62
63
* Issues arising from previous running (DC)
64
  Need a comprehensive list of encountered issues, else can't assume they will be addressed before running resumes. We are now well past halfway through the shutdown.
65
* Shutdown work in Jan and Feb ( "official version":https://micewww.pp.rl.ac.uk/attachments/download/8158 )
66
  Issues/Progress on workplan items (using a stale list):
67
68
  ** PT100s - done
69
  ** ODH sensor service - done
70
  ** POMPOMs sensor test - done
71
  ** Neutron Monitor: ISIS can't do it; will return to MICE for us to make arrangements. Continue with temporary monitor this cycle.
72
  ** Proton Absorbers - remedial work done
73
  ** "New" chiller plumbing - done
74
  ** #1878 Trench heat exchanger to counter-flow - done, possibly some small leaks
75
76
  ** Diffuser iris 4: needs next SSU run: Tuesday 7th
77
     Compressed air: Activair coming to check the outside compressor to see why it didn't come on.
78
79
  ** #1399 MICEnet lockout - tomorrow morning
80
81
  ** #1888 Diffuser air - reported done
82
  ** Airflow monitoring changes - done
83
  ** PPS Functional Test - done
84
  ** Earth leakage tests - done
85
  ** New @target1ctl@ - issues with O/S and libraries...
86
  ** R78 - replacement flanges in progress
87
88
* C&M System Check report (Ajit/Ed)
89
  CC Magnet UIs/IOCs tested last week - changes have been made on various machines, need to be aggregated.
90
  Target SM tested today.
91
  Need to test Run Control: Thursday?
92
  Need to review the tags listed in the CDB
93
  The NIKHEF Hall probes have been separated out into a different IOC.
94
  Most of the hardware stuff is done. 
95
96
* Run-up plan 
97
** Roof water/chiller needs a load test with the air-blast active - tomorrow or Thursday subject to Hall work and state of pipes 
98
** Monday 6th: Preparation meeting with Ed/Ajit/Colin/Josef/Others to go over readiness for running; remove shorts from link boxes, ATW and other prep.
99
** Tuesday 7th: Bring up CC magnets to running configuration, take some pulser data and take magnets down; _check Diffuser operation_
100
** Saturday 11th - Half-day of ISIS beamtime: expert led run without CC Magnets + Beambump tune (Hayley, NB Ed has to leave mid-afternoon)
101
** Monday 13th: Triage actions arising from expert led run; BLOC training on everything that isn't target
102
** Tuesday 14th: Bring up magnets in the evening and soak-test overnight (reserve shifters).
103
** Wednesday 15th: Data-taking start at 08:00 
104
105
* Shift signup:
106 18 Nebrensky, Henry
  With the LH2 install going ahead there will be no running during second half of 2016/05 and thus no available shift allocation - MICE that have not yet made shift quota take note. 
107 17 Nebrensky, Henry
108
* AOB:
109
  Linde Gas Analyser webcam - where has it gone? It is being PAT tested.
110
111
h3. Actions
112
113
* JBoehm to get SS operating info from PHanlet (ongoing)
114
* JBoehm to get/impose consensus from SC Magnets group on running of "Central CC GUI"
115
* DC to collate list of issues arising from previous running 
116
* Status of @miceraid5@ disk cleanup (stands)
117
* -AKurup to make and circulate plan for NIKHEF probe IOC-
118
* -SBoyd - ISIS machine-physics beam time-
119
* DC to ensure Health Physics have checked temporary neutron monitor (stands)
120
* SBoyd - ensure MICE-wide discussion of MOM C&M panel