20161213 » History » Version 4
Drielsma, François, 13 December 2016 14:18
1 | 1 | Boyd, Steven | h1. Ops/Comm Scheduling meeting |
---|---|---|---|
2 | |||
3 | Location : CR22 in R1 @ 14:00 pm on December 13th |
||
4 | |||
5 | Phone access : ReadyTalk number |
||
6 | US 866-740-1260 |
||
7 | UK 0800-496-0576 |
||
8 | Swiss 0800-70-53-51 |
||
9 | Italy 800182592 |
||
10 | Access Code: 2155402 |
||
11 | |||
12 | * MOM report |
||
13 | ** Diffuser issues |
||
14 | ** Proton absorber sticking |
||
15 | * SS Magnet status |
||
16 | * Hydrogen status |
||
17 | * Detector status |
||
18 | 2 | George, Melissa | ** Tracker: attachment:Tracker_OpsMeet13_12_2016.pdf |
19 | 3 | Rajaram, Durga | ** TOF: attachment:Run8881imageData.pdf |
20 | 1 | Boyd, Steven | ** Target: |
21 | ** CKov: |
||
22 | ** EMR: |
||
23 | ** KL: |
||
24 | 4 | Drielsma, François | * Physics shift: |
25 | ** https://micewww.pp.rl.ac.uk/projects/analysis/wiki/Physics_shift_2016-12-13 |
||
26 | 1 | Boyd, Steven | * Wednesday maintenance plans |
27 | * Shutdown plans |
||
28 | * Plans for Christmas maintenance and oversight |