1 | 1 | Boyd, Steven | ** MOM report |
---|---|---|---|
2 | *** Started 'running' on Friday evening with a 24-hour shift. |
||
3 | *** ISIS very unstable. Switched on Sunday to TS2 timing. |
||
4 | *** Conventional water issues, now resolved. |
||
5 | *** Superconducting magnets regularly monitored. Very stable. |
||
6 | *** Run plan: |
||
7 | **** Have data for 2 of the settings. |
||
8 | **** Prepared a third beam setting for recording over night |
||
9 | **** More beam tuning tomorrow. |
||
10 | *** Loss of shift cover for SS monitoring at 4pm tomorrow. |
||
11 | *** Ramp magnets down at 2pm (Agreed). |
||
12 | ** [[analysis:2016-11-19_physics-shifter|data summary as of 3.30 pm yesterday]] - Rogers gives apologies |
||
13 | ** SS Magnet status |
||
14 | *** Magnet alarms need adjusting, to reflect running performance. |
||
15 | *** Feedback from joseph to pierrick regarding operation by non-ss personel. |
||
16 | ** Hydrogen status |
||
17 | *** Cooling, Absorber at 46K. 2nd stage ~26K. |
||
18 | *** Monitor overnight and determine coldest temperature. Then will try using heater. |
||
19 | ** Conventional magnet water flow issue |
||
20 | *** Removed PLC from both contentional water pumps. |
||
21 | *** Pump set to deliver constrant pressure from configuration app. |
||
22 | ** Wednesday maintenance plans |
||
23 | *** No plans. |
||
24 | ** Run plans for the next week (discuss) |
||
25 | *** Wednesday 23rd : ramp down the SS magnets / maintenance |
||
26 | *** Thursday : Shift training + 1 shift - straight track running |
||
27 | *** Friday - Sunday : 1 shift per day - straight track running |
||
28 | *** Monday 28th : ramp up SS magnets |
||
29 | |||
30 | * Missing shifts |
||
31 | ** Still have some missing shift slots for minimal running |
||