Project

General

Profile

Actions

Ops/Comm Scheduling meeting

Location : CR21 in R1 @ 15:30 pm on November 1st

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

Hall work

Operations

  • MOM report and run plan to end of user cycle
    • Data-taking Summary to date: attachment:MiloradForKan.ods
Overall run time 51 hours
Task Description Momentum Triggers taken SSU (ECE) SSU M1/M2 FC SSD (ECE) SSD M1/M2 Beamline tag Cooling channel tag
2 Scattering 140 675k at TOF2 Y Y/Y Solenoid Y N/N 3-140+M3-Test2 CCramp-6.1.4-NoTrims
3 Scattering 170 537k at TOF2 Y Y/Y Solenoid Y N/N 3-170+M3-Test1 CCramp-6.1.4-NoTrims
4 Scattering 200 508k at TOF2 Y Y/Y Solenoid Y N/N 3-200+M3-Test1 CCramp-6.1.4-NoTrims
5 Scattering 240 517k at TOF2 Y Y/Y Solenoid Y N/N 3-240+M3-Test1 CCramp-6.1.4-NoTrims
  • Beam tuning
  • Runs with different diffuser settings
  • Physics summary (C. Rogers)
  • Scheduling of the expert led run for next user cycle

Updated by Boyd, Steven over 6 years ago ยท 5 revisions