Boyd, Steven, 06 September 2016 14:58


Ops/Comm Scheduling meeting

Location : CR21 in R1 @ 15:30 pm on September 6th

Phone access : ReadyTalk number
US 866-740-1260
UK 0800-496-0576
Swiss 0800-70-53-51
Italy 800182592
Access Code: 2155402

  • DC report
    • SSU/FC ramp went well
    • SSD diode test report
    • DS compressor progress
    • Aircon in RR2 now keeping rack temperatures beneath 30C.
    • Water to conventional magnets...
    • MICE hall tour for FFAG workshop, Wednesday 7th September
    • Other:
      • Need to get downstream tracker cooling ASAP
      • Cover for SS QP cables in RR2
      • UPS to be installed in RR!

Operations and data-taking

  • Data-taking
    • Start of data-taking has been pushed back to 18 or 19 September (from the 13th).
    • Will need to make a decision once the DS work has been carried out on how/when we run.
    • We do need an expert run : this has been discussed and planned for Sept 12 (pulsers) and Sept 13 (beam).
    • We will need to do beam tuning as usual.
  • Maintenance plans
    • Should decide on a regular maintenance slot (for e.g. checking temporary neutron monitor)
      • Wednesday morning?
  • AOB
  • DONM : 13th September in CR12

Updated by Boyd, Steven over 7 years ago · 7 revisions