h1. Ops/Comm Scheduling meeting
2
3
Location : CR21 in R1 @ 15:30 pm on September 6th
4
5
Phone access :  ReadyTalk number 
6
US 866-740-1260
7
UK 0800-496-0576
8
Swiss 0800-70-53-51
9
Italy 800182592
10
Access Code: 2155402
11
12
* DC report
13 3 Blackmore, Victoria
** SSU/FC ramp went well
14
** SSD diode test report
15
** DS compressor progress
16
** Aircon in RR2 now keeping rack temperatures beneath 30C.
17
** Water to conventional magnets...
18
** MICE hall tour for FFAG workshop, Wednesday 7th September
19
** Other:
20
*** Need to get downstream tracker cooling ASAP
21
*** Cover for SS QP cables in RR2
22
*** UPS to be installed in RR!
23
24 1 Boyd, Steven
* Plans for the following week
25 2 Boyd, Steven
* [[StepIV Shutdown tasks|http://micewww.pp.rl.ac.uk/projects/operations/wiki/_StepIV_Shutdown_Summer_]]
26 1 Boyd, Steven
* AOB 
27
28
* DONM : 13th September in CR12