1 1 Boyd, Steven
h1. Ops/Comm Scheduling meeting
2
3
Location : CR21 in R1 @ 15:30 pm on September 6th
4
5
Phone access :  ReadyTalk number 
6
US 866-740-1260
7
UK 0800-496-0576
8
Swiss 0800-70-53-51
9
Italy 800182592
10
Access Code: 2155402
11
12 8 Boyd, Steven
h2. Hall work
13
14 1 Boyd, Steven
* DC report
15 3 Blackmore, Victoria
** SSU/FC ramp went well
16 10 Boyd, Steven
*** Yay. But need to be careful that run settings have been tested before hand.
17 3 Blackmore, Victoria
** SSD diode test report
18 10 Boyd, Steven
*** SSD ramping down now. A bit of noise was seen but not the amount we've been seeing. However there was still unacceptable noise.
19
*** We are going to test SSU tomorrow. The noise problem has not been cured.
20 3 Blackmore, Victoria
** DS compressor progress
21 10 Boyd, Steven
*** Leak has not been found, but contamination continues rising. 
22
*** Will need to strip down the compressor (weeks work), then cooling the DS down will take more time. 
23 1 Boyd, Steven
** Aircon in RR2 now keeping rack temperatures beneath 30C.
24 10 Boyd, Steven
*** Racks are now cool enough. Area outside the control room is now a sauna.
25
** Water to conventional magnets.
26
*** A leak was sprung in the trench when we tried to put conventional magnet water supply on. This was a reflection of partial control of
27
the pumps in the trench which are on full power and putting too much pressure in the system. We have a route out of the problem. Water to
28
conventional magnets are off until Thursday at best. John wants to get into DSA to shut a valve to do the work and then needs to open it again.
29 1 Boyd, Steven
** MICE hall tour for FFAG workshop, Wednesday 7th September
30 10 Boyd, Steven
*** Paolo/Durga giving tours
31 3 Blackmore, Victoria
** Other:
32 1 Boyd, Steven
*** Need to get downstream tracker cooling ASAP
33 10 Boyd, Steven
**** The RGA testing on the tracker will start tomorrow.
34 1 Boyd, Steven
*** Cover for SS QP cables in RR2
35 10 Boyd, Steven
**** Cable covers need to be installed.
36
*** UPS to be installed in RR1
37 1 Boyd, Steven
38 10 Boyd, Steven
* Shandor arrives tomorrow, Alan arrives on Thursday, Shandor goes on Tuesday. 
39
** Get in touch with Yordan and say that we will be doing the expert startup
40
** Need to tell ISIS people when we do a beam tune.
41
42 2 Boyd, Steven
* Plans for the following week
43 6 Boyd, Steven
* [[StepIV Shutdown tasks|http://micewww.pp.rl.ac.uk/projects/operations/wiki/_StepIV_Shutdown_Summer_]]
44 7 Boyd, Steven
45
h2. Operations and data-taking
46 6 Boyd, Steven
47 5 Boyd, Steven
* Data-taking
48
** Start of data-taking has been pushed back to 18 or 19 September (from the 13th). 
49 4 Boyd, Steven
** Will need to make a decision once the DS work has been carried out on how/when we run.
50 1 Boyd, Steven
** We do need an expert run : this has been discussed and planned for Sept 12 (pulsers) and Sept 13 (beam). 
51
** We will need to do beam tuning as usual. 
52 6 Boyd, Steven
* Maintenance plans
53 10 Boyd, Steven
** Need to compile a list of "regular" checks needed in the Hall during run periods
54 1 Boyd, Steven
** Need to decide on a regular maintenance slot (for e.g. checking temporary neutron monitor)
55 9 Boyd, Steven
*** Wednesday morning?
56 6 Boyd, Steven
* AOB 
57 10 Boyd, Steven
** New DC phone number is on the expert list
58 1 Boyd, Steven
59
* DONM : 13th September in CR12
60 10 Boyd, Steven
61
h1. Minutes
62
63
* Present : SB, CW, VB, PF, JC, MU, VB, EO, CR, HN